1986 1 AVENUE, Manhattan, NY, 10029 · New York City · 16 total events
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
IT IS PROPOSED TO REPAIR FACADE AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
CTV NASH. PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH.
CTV -NASH. MECHANICAL WORK FOR RENOVATIONS TO THE 2ND FLOOR OFFICE AS PER PLANS FILED HEREWITH.
CTV NASH. PLUMBING AND SPRINKLER WORK AS PER PLANS FILED HEREWITH.
CTV -NASH. RENOVATIONS TO THE 2ND FLOOR OFFICE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
General construction as per submitted plans. no change to use egress or occupancy
Installation of new generator as per submitted plans. no change to use egress or occupancy.
Mechanical modifications as per submitted plans. No change to use egress or occupancy.
Replacement of existing antennas and equipment cabinets; installation of surge units on rooftop & 4th FL (AT&T - 10104847) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy.
Sprinkler modifications as per submitted plans. No change to use egress or occupancy
Plumbing modifications as per submitted plans. No change to use egress or occupancy.
Installation of fuel storage tank as per submitted plan.NO change to use, egress, or occupancy.
- NEW ELEVATOR HOISTWAY FIRST FLOOR FLOOR THROUGH ROOF. - LIMITED OFFICE RENOVATIONS AT SECOND, THIRD, SIXTH, SEVENTH, AND EIGHTH FLOORS. - GENERATOR DUNNAGE AT SEVENTH FLOOR (ROOF). - GENERATOR, FUEL OIL, AND FIRE ALARM SHAFT UNDER SEPARATE APPLICATION.
REPLACEMENT OF EXISTING ANTENNAS AND RRH UNITS. INSTALLATION OF NEW RRH UNITS ON THE ROOFTOP (AT&T - 10104847) AS PER PLANS. ALL WORK IS IN COMPLIANCE WITH TPPN 5/98. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
AT&T / Replacement of existing telecommunications antennas with replacement of related of RRH units on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.