FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
AT TIME OF INSPECTION, PREMISES VACANT OPEN AND UNGUARDED - DOOR AT PARLOR LEVEL UNLOCKED, WINDOWS UNSEALED AT PARLOR LEVEL, 1ST, 2ND AND 3RD FLOOR
No description available
FTM:3ST+B+C WOOD FRAMING OVER SOLID MASN PARTY WALLS@EXP2&4.THE BLDG INT STAIR IS SUPPT'D W/NON ENGINEERED SHOR@CELLAR LEVEL.THE SAME STAIR IS EXCESSIVELY LEAN FROM 2-3 FL.STUCCO CEILING PART COLLAP EXPOSING WOOD JOIST@SEVERAL LEVELS.OWNR TO ENGAGE NYSPE&ENDORSED CONTRCT EVAL WHOLE BLDG&OBT PRMTS FOR REPRS N/L/T 11/9/19.S/O REPR JOB N/L/T 3/2/20
FTM:DUE TO 2 ALRM FIRE OCCURR ON 9/16/19 THE BLDG SUFFER STRCTL DMG AS FOLLOW:MAIN STAIR INSIDE BLDG FROM 1-2 FL & 2-3 FLRS SEVERE COMPROMISE WITH STEPS&RAILING MISSING/BURNT.STAIR@RISK OF FURTHER COLLAPSE.JOIST ARE EXPOSE&MOD FIRE DMG@2&3 ROOF FLRS.OWN ENGAGE NYSPE&ENDORSE CONTRCT TO EVAL WHOLE BLDG&OBT PRMT FOR REPR N/L/T 11/9/19.S/O REPR JOB 3/2/20
DUE TO FIRE
DUE TO FIRE