1980 LEXINGTON AVENUE, Manhattan, NY, 10035 · New York City · 32 total events
WATER SUPPLY
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
Installation of suspended scaffold for facade work or inspection.
APARTMENT ONLY
LIMITED EXTERIOR REPAIR IN CONJUNCTION WITH RENOVATION OF 11-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
ENTIRE BUILDING
ELECTRIC/GAS RANGE
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 10H, 10th STORY, 4th APARTMENT FROM WEST AT NORTH
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8G, 8th STORY, 3rd APARTMENT FROM WEST AT NORTH
APARTMENT ONLY
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
NYCHA BOILER- DEMOLITION AND REMOVALS OF BOILERS AND RELATED HEATING PLANT EQUIPMENT. NEW LOW PRESSURE HOT WATER BOILERS AND RELATED EQUIPMENT, AND CONNECTIONS TO BUILDING DISTRIBUTION SYSTEM.
UPACA - SITE #5, INSTALLATION OF (2) TEMPORARY STACKS AND 6 HOT WATER SUPPLY AND RETURN PIPING CONNECTED TO MOBILE BOILER TRAILERS AND THE EXISTING BUILDING HEATING SYSTEM TO PROVIDE HEAT DURING THE HEATING SEASON. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
UPACA - SITE #5, INSTALLATION OF TEMPORARY 8 GAS PIPING AND 4 HOT / COLD WATER PIPING CONNECTED TO (2) MOBILE BOILER TRAILERS AND THE EXISTING BUILDING HEATING SYSTEM TO PROVIDE HEAT DURING THE HEATING SEASON. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYCHA BOILER: New penetrations for exhaust flue and air intake at wall of boiler room, Remove existing combustion air louvers and replace with new louvers, New facade opening to facilitates new boiler equipment delivery,
NYCHA BOILER: New penetrations for exhaust flue and air intake at wall of boiler room, Remove existing combustion air louvers and replace with new louvers, New facade opening to facilitates new boiler equipment delivery,
REMOVE AND REPLACE TWO STEAM BOILERS WITH TWO HOT WATER BOILERS IN THE BOILER ROOM. REMOVE AND REPLACE ONE STEAM WATER HEATER WITH FOUR HOT WATER HEATERS IN THE BOILER ROOM.
NYCHA BOILER- 1.REMOVE EXISTING STEAM INSTANTANEOUS TO HOT WATER HEATERS AND ASSOCIATED PIPING AND EQUIPMENT IN BOILER ROOM. PROVIDE NEW PACKAGED CONDENSING GAS FIRED WATER HEATERS AND STORAGE TANKS IN BOILER ROOM ALONG WITH ALL ASSOCIATED. PUMPS, PIPING
INSTALLATION OF BETA HOIST AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 BC.
Filing for temporary construction fence. No change in use, egress or occupancy.
UPACA - SITE #5, INSTALLATION OF +/- 150 LINEAR FEET OF SIDEWALK SHED ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # M00467921. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
UPACA - SITE #5, INSTALLATION OF A 10,000-GALLON OIL TANK CONNECTED TO MOBILE BOILER TRAILERS TO PROVIDE HEAT DURING HEATING SEASON ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # M00467921. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SCOPE OF WORK INCLUDES BUT NOT BE LIMITED TO NEW RAILING INSTALLATION HORIZONTALLY TO THE PARAPET WALL AT MAIN ROOF AND MECHANICALROOM ROOF, REPLACING EXISTING STAIRS OUTSIDE THE MECHANICAL ROOM, CONCRETE AND CMU REPAIR.
SCOPE OF WORK INCLUDES BUT NOT BE LIMITED TO NEW RAILING INSTALLATION HORIZONTALLY TO THE PARAPET WALL AT MAIN ROOF AND MECHANICALROOM ROOF, REPLACING EXISTING STAIRS OUTSIDE THE MECHANICAL ROOM, CONCRETE AND CMU REPAIR.
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1980 LEXINGTON AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.