1884 1 AVENUE, Manhattan, NY, 10029 · New York City · 26 total events
ARMSTRONG BUILDING INFRASTRUCTURE UPGRADE. PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
ARMSTRONG BUILDING INFRASTRUCTURE UPGRADE. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
ARMSTRONG BUILDING INFRASTRUCTURE UPGRADE. MECHANICAL SYSTEM MODIFICATIONS AS PER PLANS FILED HEREWITH.
ARMSTRONG BUILDING INFRASTRUCTURE UPGRADE. STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
ARMSTRONG BUILDING INFRASTRUCTURE UPGRADE. PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH.
Modifications to existing Mechanical Systems as per plans filed herewith. Installation of commercial cooking system and ventilation system (Hood/Duct) on the 1st floor. No change in use, egress or occupancy.
Modification to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Interior renovation to include demolition of existing and construction of new partitions and finishes as shown on plans. No change in use, egress, or occupancy under this application.
File plumbing work in conjunction with DOB Now Construction #M00510220. Install commercial cooking equipment & plumbing fixtures at the existing kitchen of Eating & Drinking Establishment. No change in use, egress, or occupancy.
Interior and Exterior alteration to existing restaurant exhaust duct from 1st floor to roof as shown in plan.
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SIDEWALK SHED AND SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
INSTALLATION OF SIDEWALK SHED AND SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
Propose interior renovation at partial 1st floor of existing commercial building with new partition work and finish work as per plan. No change in use, egress, or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY 79' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED)FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION