188 EAST 78 STREET, Manhattan, NY, 10075 · New York City · 38 total events
Propose interior renovation of apartment 4D. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
0 infested unit(s) reported
Replacement of existing 10 plumbing fixtures on the same location.
PROPOSED INTERIOR RENOVATION OF KITCHEN AND BATHROOMS N 16A UNIT.MINOR NON BEARING WALL DEMOLITION AND NEW PARTITION NEW FLOORING,MINOR PLUMBING AND ELECTRICAL WORK NO CHANGE IN USE,EGRESS OR OCCUPANCY.
MODIFICATION OF INTERIOR PARTITIONS AND PLUMBING WORK IN APARTMENT 19A ON THE 19TH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. REPLACE: (6)LAV, (5)WC, (2)SHOWERS AND REMOVE/CAP: (1)LAV, (1)WC, (1)BATHTUB
MODIFICATION OF INTERIOR PARTITIONS AND PLUMBING WORK IN APARTMENT 19A ON THE 19TH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCBC
Remove and replace coping stones, install waterproofing where necessary.
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEIILINGS AND FLOORING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
TENANT FIT-OUT FOR 1ST FLOOR RETAIL SPACE.
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND INSTALL IN 1ST FLOOR RETAIL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALL ILLUMINATED SIGN READING FEDEX'
REMOVAL AND INSTALLATION OF UNITS, DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON 1ST FLOOR RETAIL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MODIFICATION TO PLUMBING FIXTURES AND PIPING IN 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS 1ST FLOOR RETAIL SPACE AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Sprinkler work filed for of unit 19B
Plumbing work filed for renovation unit 19B
Interior Renovation to apartment Unit # 19B. Minor interior partition, plumbing and sprinkler work. No change in use, egress and occupancy.
ERECT ILLUMINATED WALL SIGN AND NON-ILLUMINATED PANEL FOR WELLS FARGO- ACCESSORY BUSINESS SIGNAGE.
GENERAL CONSTRUCTION RENOVATION OF APARTMENT 23A ON THE 23RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, AND OCCUPANCY.
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #15A. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
Filing plumbing work in conjunction with alteration application of apt 22B; no change to use, egress or occupancy
Interior renovation of kitchen including removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.
PLUMBING WORK IN CONJUNCTION WITH APPLICATION #M00800082 FOR RENOVATION OF EXISTING APARTMENT. NO CHANGES IN USE, OCCUPANCY OR MEANS OF EGRESS
INTERIOR RENOVATION OF EXISTING APARTMENT ON PENTHOUSE FLOOR. NON-STRUCTURAL PARTITION CHANGES. REMOVE CEILING TO INSTALL NOISE/VIBRATION MEMBRANE.PLUMBING FILED UNDER APPLICATION #M00800090.NO CHANGES IN USE, OCCUPANCY OR MEANS OF EGRESS
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #15A. WORK INCLUDES NEW/REPLACE PLUMBING FIXTURES WITH ASSOCIATED PIPING WORK, AND FIRE-STOPPING IS PROVIDED.
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #15A. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
Installation of steel pergola framing and fence frame at low roof (2nd story roof).
Filing sprinkler work in conjunction with interior renovation application; no change to use, egress or occupancy.
Filing mechanical work in conjunction with interior renovation application for apt 22B; no change to use, egress or occupancy.
Filing for the alteration of apartment 22B with interior partitions; no change to use, egress or occupancy.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Installation of steel pergola framing and fence frame at low roof (2nd story roof).
Install concrete curb supports for mechanical, equipment filed under application M00475535-I1
Replace (1) roof-mounted condenser with (1) 8-ton condenser serving the mechanical room and (1) 15-ton condenser serving the common hallways of the premise, replace supply duct, louver at roof all other ductwork is existing
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
PERFORM PLUMBING WORK INCONJUNCTION WITH APARTMENT#11B RENOVATION. GENERAL CONSTRUCTION WORK FILED AND APPROVED UNDER ALTERATION II#140919282. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
INSTALLATION OF AN ILLUMINATED ACCESSORY BUSINESS WALL SIGN. READING : GRISTEDES