187 1 AVENUE, Manhattan, NY, 10003 · New York City · 9 total events
Installation of suspended scaffold for facade inspection/repair.
Decommission of existing SPRINT telecom site on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Exterior facade repairs per the plans filed including: Spalled / cracked masonry repairs. Masonry re-pointing. Stone and terracotta repairs. Sealant joint restoration. Canopy gutter replacement.
INSTALL A TWO TON SPLIT AIR CONDITIONING UNIT FOR FIRST FLOOR LOBBY. CONDENSER IN AN ADANDONED SHAFT IN CELLAR. A FRIERATED ENCLOSUREFOR REFRIGERANT PIPING.
INSTALLATION OF 195' NEW SIDEWALK SHED AT 375 GREENWICH ST AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
INSTALL A TWO TON SPLIT AIR CONDITIONING UNIT FOR FIRST FLOOR LOBBY. CONDENSER IN AN ADANDONED SHAFT IN CELLAR. A FRIERATED ENCLOSUREFOR REFRIGERANT PIPING.
REPLACE EXISTING 20 TON ROOF TOP AIR CONDITIONING UNIT ON EXISTING STEEL. DUCT CONNECTION MODIFICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 375 GREENWICH STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT 375 GREENWICH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.