185 BROADWAY, Manhattan, NY, 10007 · New York City · 36 total events
SPRINKLER MODIFICATIONS TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING MODIFICATIONS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MECHANICAL MODIFICATIONS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
0 infested unit(s) reported
Modifications to the existing plumbing system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 3rd floor (Pre-build Suite) as per plans. No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Install (1) new sprinkler head, Relocate (21) existing sprinkler heads and remove (1) sprinkler head and associated piping on the 1st Floor as per plans (T-Mobile.) No change to use, egress or occupancy.
NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - T. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - T MOBILE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Install new plumbing fixtures: (1) water closet, (1) lavatory, (1) floor drain, (2) sinks, (1) HWH, (1) water dispenser and associated CW/sanitary/vent piping on the 1st Floor as per plans (T-Mobile Retail Store.) No change to use, egress or occupancy.
Modifications to the existing HVAC System; Relocate and extend ductwork, install new controls, exhaust fans and transfer grills on the 1st Floor as per plans (T-Mobile Retail Store.) No change to use, egress or occupancy.
Minor interior demo; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (T-Mobile Retail.) No change to use, egress or occupancy.
REFRIGERATOR
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Herewith filing sprinkler work at 1st floor demised retail/bank space.
WINDOW FRAME
ERECT ACCESSORY BUSINESS WALL SIGN FOR WELLS FARGO, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Sprinkler modifications and associated piping for interior tenant fit-out (wells fargo retail tenant). There will be no change in use, egress, or occupancy.
Plumbing modifications and new fixtures with associate piping as per plans. There will be no change in use, egress, or occupancy.
Herewith filing plumbing work at 1st floor retail / bank demised spaces.
HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy
Installation of interior non-load bearing partitions and related finishes for interior tenant fit-out including a structural beam for new folding wall. There will be no change in use, egress, or occupancy.
Installation of new gas-fired fireplace with associated ducts and an exhaust fan. All Structural details, supports and gas lines filed in NB application # 121188703. No change in use group, egress and occupancy.
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AS SHOWN ON PLANS
MODIFICATONS TO EXISTING SPRINKLER SYSTEM ON THE 2ND FLOOR.
Installation of new plumbing fixtures and associated piping on the 2nd floor (One Medical) as per plans. No change to use, egress or occupancy,
Installation of a new HVAC system on the 2nd floor (One Medical) as per plans. No change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 2nd floor (One Medical) as per plans. No change to use, egress or occupancy.
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NEW BLDG CONS, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary construction fence and jersey barrier per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.