175 EAST 82 STREET, Manhattan, NY, 10028 · New York City · 34 total events
INSTALLATION OF JERSEY BARRIER & PLYWOOD FENCE AS PER PLANS. THE JERSEY BARRICADE & FENCE TO BE INSTALLED ON THE ROADWAY AND SHALL BE PERMITTED AT DOT. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHERS
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT TRUCK E NTRANCE OVER THE STREET LANE PEDESTRIAN WALKWAY.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PLYWOOD FENCE AT EAST 82ND STREET AND 3RD AVENUE ELEVATIONS.
INSTALLATION OF TEMPORARY CONSTRUCTION BARRIERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE BARRICADE IS AT EAST 82ND STREET AND 3RD AVENUE ELEVATIONS.
INSTALLATION OF TEMPORARY SYSTEM STAIRS TOWER AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SYSTEM STAIRS TOWER FROM THE FIRST FLOOR TO THE EIGHTH FLOOR AT EAST 82ND STREET ELEVATION
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY NEED BEAM/OVERHEAD PROTECTION.AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE NEED BEAM SYSTEM/OVERHEAD PROTECTION AT THE NORTH ELEVATION ON THE 8TH FLOOR OVER THE NORTH NEIGHBOR BUILDING.
INSTALLATION OF PLYWOOD FENCE & JERSEY BARRIER AS PER PLANS. THE FENCE & JERSEY BARRICADE TO BE INSTALLED ON THE ROADWAY AND SHALL BE PERMITTED AT DOT. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHERS
INSTALLATION OF TEMPORARY NEEDLE BEAM / OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE NEEDLE BEAM OVERHEAD PROTECTION AT 8TH FLOOR IN THE BUILDING
TEMPORARY STANDPIPE INSTALLATION, ALL AS PER PLAN AND REFERENCE TO PERMANENT STANDPIPE UNDER M01030152.
INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
Installation of new HVAC System throughout the building: Install new ductwork, intake air louvers, exhaust fans, Cooling tower, AC and Condensing Units, ductwork and pipe connections, refrigerant piping risers, DOAS, electric heaters, VAVs as per plans.
Herewith filing Superstructure application filed in conjunction with New Building # M00995463-I1
HEREWITH FILING ERECTION OF NEW RESIDENTIAL BUILDING (tax lot 31).
Installation of new emergency generator, wiring, piping and regulator vents on the 20th Floor (CO)/ M1 (Mktg) and emergency generator gas booster and gas meter and associated piping and regulator vents on the Cellar Level as per plans.
Installation and use of power operated hoisting equipment, specifically a 5-ton-push-trolley between the Ground floor and Cellar level.
Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans.
Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans.
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filing for installation of temporary toilet fixtures as per plans filed herewith. No change in use, egress or occupancy in this application.
INSTALLATION OF MULTI-POINT IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF 2-PT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED IS AT E 82ND STREET AND 3RD AVENUE ELEVATIONS. THE SIDEWALK SHED AT 2ND FLOOR ROOF, AT 170 E 83RD STREET AND BALCONY OF 167 E 82 STREET
Installation and use of temporary exterior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.
INSTALLATION AND USE OF TEMPORARY LOADING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Herewith filing curb cut on East 82nd Street. Work in conjunction with New Building #M00995463-I1, and BPP application #141025469.
Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pressure sensor and future boiler connections on the Cellar as per plans.
Filing for support of excavation work to include installation of soldier piles within the sidewalk to facilitate excavation for a temporary crane pad as per plans filed herewith.
Installation of underground plumbing fixtures: (15) new Floor Drains, (2) new duplex sewer ejectors, (2) new elevator sump pumps, (1) storm ejector and associated sanitary/CW piping on the Cellar level as per plans. No change to use, egress or occupancy.
Herewith filing Foundation filing in conjunction with New Building.
HEREWITH FILING SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH NEW BUILDING.
HEREWITH FILING EARTH WORK IN CONJUNCTION WITH NEW BUILDING.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.