170 WEST END AVENUE, Manhattan, NY, 10023 · New York City · 67 total events
PARTIAL DEMOLITION OF NON LOAD BEARING PARTITIONS. KITCHEN AND BATHROOMS REPLACEMENT OF FIXTURES AND FINISHES IN PLACE. REPLACE WOOD FLOOR, PARTIAL CEILING WORK AT KITCHEN.
MATERIAL HOIST
0 infested unit(s) reported
RENOVATIONS TO APT 19C, PARTITIONS, FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
5K: Interior renovations as per plans filed herewith. No change to use, egress or occupancy
GENERAL CONSTRUCTION TO INCLUDE: PARTITION LAYOUT CHANGES, NEW FINISHES AND PAINTING.- PLUMBING TO BE FILED SUBSEQUENT TO THIS APPLICATION. No change to use, egress or occupancy.
installation of new washer on the pan, replacement of existing kitchen and bathrooms fixtures on existing roughing. gas range to be replaced with gas cooktop and gas oven. 11 fixture total
interior renovation to apartment 18N as indicated on the drawings
RENOVATE APT. 20N. NEW DROPPED CEILING AT ENTRY WITH LIGHTING. CREATE NEW BEDROOM IN EXISTING ALCOVE. NEW DINING ROOM CHANDELIER WITH SURFACE MT ELECTRIC IN CONDUIT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
IN UNIT 17S, REMOVAL AND INSTALLATION OF NEW NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
Alt 2 for new branch plumbing lines for Kitchen, Laundry Room, 2 Bathrooms. No gas work.
ALT 2-COMBINATION OF STUDIOS APT 28R&APT 28S. UPGRADED EXISTING KITCHEN AND 2 EXISTING BATHROOMS. REMOVE KITCHEN AT 28R AND ADD LAUNDRY ROOM. NEW PARTITIONS AND NEW FINISHES. NEW APPLIANCES AND PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Plumbing work at Apartment 26F.
ALT-2 ALTERATION OF APT 26F. THE SCOPE OF WORK TO INCLUDE DEMOLITION OF BATHROOM & KITCHEN, ALL PLUMBING FIXTURES, BATHROOM 7 KITCHEN UPGRADE. CONVERT SLEEPING ALCOVE TO BEDROOM. NO EXTERIOR WORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Apt. 19K: ADD WALL TO CREATE BEDROOM, NEW FLOORING OVER EXISTING, ADD NEW ELECTRICAL PANEL, THERE IS NO WORK IN THE BATHROOM AND KITCHEN.. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Plumbing work per Plumbing Riser Diagram
Installation of suspended scaffold for facade work and /or inspection .Amend #1, added scaffold drops
ALT TYPE 2 TO COMBINE APT 10M & APARTMENT 10N. REMOVE KITCHEN AND ADD LAUNDRY ROOM. TWO BEDROOMS, BATHROOM & FAMILY ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of suspended scaffold for facade work and /or inspection .Amend #1, added scaffold drops
RENOVATIONS TO CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ALT TYPE 2 TO UNCOMBINE STUDIO 23C FROM ONE BEDROOM APARTMENT 23B. RETURN KITCHEN AT ORIGINAL KITCHEN 23C. NEW APPLIANCES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
DESIGN INCLUDES REPLACEMENT OF AN EXISTING CHILLER IN KIND FOR AN EXISTING 29 STORY MIXED USE BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
PLUMBING FIXTURES IN APTS 2L & 2M FOR COMBINATION OF APTS FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
COMBINATION OF APTS 2L & 2M FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
ALT TYPE 2 TO UPGRADE EXISTING KITCHEN AND BATHROOM. NEW BEDROOM. NEW FLOORING, PAINTING AND LIGHTING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MOLD
Work includes per the filed plans concrete spall repair, brick stitching cap flashing replacement/cap stone resetting, sealant joint restoration, masonry repointing, cracked/spalled masonry repair, lintel repair/replacement.
HEREWITH FILE APPLICATION TO RENOVATE EXISTING BEDROOM IN EXISTING APT 29P; WORK TO INCLUDE REMOVING AND INSTALLING NON-BEARING PARTITIONS AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH #M00696462-I1 AS PER PLANS SUBMITTED. NO CHANGE IN USE EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 2D AT SECOND FLOOR OF EXIST. 29-STORY ELEVATOR BUILDING AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of sidewalk shed as indicated on the attcahed drawings. There ae no changes in use, egress or occupancy
INSTALL FOUR STEAM TO HOT WATER DOMESTIC HOT WATER HEAT EXCHANGERS. EXTEND STEAM RISER TO HEAT EXCHANGERS.
RENOVATION OF (1) EXISTING CLASS A APARTMENT INCLUDING NON-STRUCTURAL PARTITIONS AND PLUMBING WORK AS PER PLANS FILED HEREWITH. PLUMBING WORK TO BE FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY
COMBINING APARTMENTS 1CD AND 1B ON THE FIRST FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Renovation of Bathroom and Kitchen to replace existing fixtures and appliances with New.
Interior renovation of Apartment. Work to include non-structural demolition, General Construction and related finishes, as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovations to exist'g coop apt #11P for combination with exist'g coop apt #11R. Work to include non-structural demolition, general construction & finishes. Apartments combined in compliance with TPPN 3/97. No change in use, egress or occupancy.
PLUMBING WORK RELATED TO GENERAL CONSTRUCTION APPLICATION M00676680 AS PER PLANS FILED HEREWITH.
General Construction: Remove and install interior non load bearing partitions and hung ceilings in apt. 8P.
Plumbing work filed in conjunction with the renovation of a dwelling unit. as per plans. Architectural work filed under a separate application. No change of use, occupancy or egress.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Renovation of an existing dwelling unit as per plans. Plumbing work filed under a separate application. No change of use, occupancy or egress.
Apt. 5T- minor partition layout changes, remove doors, replace doors, repaint entire apartment. No change to use, egress or occupancy.
ELECTRIC/GAS RANGE
Combine Apts. 2P and 2R, removal of non bearing partitions, kitchen & bathroom fixtures, new partitions, new doors, frames, flooring, fixtures. Combination to comply with TPPN 03/97. No change to use, egress or occupancy. Plumbing filed under an LAA.
MODIFICATION OF EXISTING PLUMBING SYSTEM IN APARTMENTS #5L/5M, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Combine Apts. 2P with 2R, plumbing work to include cap/remove, replace, relocate and install plumbing fixtures.
Interior renovation& combination of apt. 5L & 5M. Work to include non-structural demolition, general construction & related finishes. Apartments combined in compliance with TPPN 3/97. No change in use, egress or occupancy.
CARBON MONOXIDE DETECTOR