166 EAST 96 STREET, Manhattan, NY, 10128 · New York City · 24 total events
0 infested unit(s) reported
New Structural Beam for enlarged stair opening.
New, Replaced, and Relocated Plumbing Fixtures and Appliances as per Plumbing Drawings.
New Mechanical Heating and Cooling System as per Mechanical Drawings
PLUMBING WORK IN APARTMENT 9A IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB#M01211523. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior renovation as per Architectural Plans. No change to occupancy, use, or egress.
RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK IN APARTMENT 1A IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB#M01207223. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FACADE REPAIRS FROM FLOORS 1-16, REPAIR BRICK, DECORATIVE STONE, MASONRY JOINT REPOINTING, SCRAPE, PRIME AND PAINT WINDOW LINTEL, AND DECORATIVE STONE COATING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FACADE RESTORATION
FACADE RESTORATION
APPLICATION FOR PLUMBING WORK IN BATHROOM OF APARTMENT 8A.
INTERIOR RENOVATION IN APT 11C. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
PLUMBING FIXTURES IN APT 11C. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
RENOVATION OF KITCHEN
PL WORK INCLUDES REPLACEMENT OF (2) WC'S ON EX. ROUGHING, RELOCATE (1)KS, REMOVE (1)GAS RANGE + PROVIDE GAS LOCK VALVE ON EX. GAS BRANCH PIPING + NEW FIXTURES _ NEW PL PIPING FOR ALL NEW PL FIX ON 8TH FL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
LEGALIZATION FILING FOR PRIOR COMBINATION OF UNITS 8C+8D. REMOVED DEMISING WALL, (1) KITCHEN, AND RECONFIGURED (1) BATHROOM. NO WORK PROPOSED UNDER THIS APPLICATION.
PROPOSED INTERIOR RENO TO APT 8 C/D. WORK INCLUDES, BUT NOT LIMITED TO, DEMO/INSTALL OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Install NEW DEP antenna site. Install (2) antennas on bulkhead. Install (1) DCU cabinet on roof at bulkhead and (1) related solar panel on bulkhead. No change in use, egress or occupancy
INSTALLATION OF CHAIN LINK FENCE FOR PUBLIC PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.