finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.
ARCHITECTURAL AND PLUMBING WORK TO RENOVATE THE INTERIOR OF DUPLEX UNITS #57C & #58C ON THE 52ND AND 53RD FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work.
- CAP AND REMOVE SHOWER- CAP AND REMOVE GAS STOVE- RELOCATE ONE LAV- REPLACE ONE SINK, ONE DISHWASHER, 2 LAVS, 2 TOILETS, REPLACE TUB WITH SHOWER
0 infested unit(s) reported
Obtain DOB approval for renovation. Scope of work: general construction and plumbing. No change in use, egress, or occupancy.
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work for a duplex apartment on the 52nd and 53rd floors. No change in use, egress, or occupancy.
INTERIOR RENOATION AND COMBINATION OF APARTMENTS 41BC ABD 41D PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED PLUMBING APPLICATION WILL BE FILED SEPERATELY BY THE PLUMBER.
Filing for structural work at the roof. Work includes removal and installation of dunnage and post supports. No change to use, egress, or occupancy.
REPLACE EXISTING AC UNITS AND EXISTING BATHROOM EXHAUST GRILLES. INSTALL RADIANT HEAT IN TWO BATHROOMS. NO CHANGE IN USE OCCUPANCY OR EGRESS.
INTERIOR RENOVATION OF APARTMENT PHA ON THE 56TH FLOOR. RELATED MECHANICAL AND PLUMBING FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
BULKHEAD REPAIRS
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
INTERIOR RENOVATION OF APARTMENT 33B ON THE 33RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 33B ON THE 33RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
RENOVATE BATHROOMS, KITCHEN, INSTALL LAUNDRY ROOM AND REMOVE SAUNA IN APARTMENT PHA. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
New fire-rated door in existing opening to the tenant suite on 6th. Part of the 6th floor changed from community Facility offices to studios, lounge, and accessory offices (same use group). Occupant load of the 6th floor increased from 120 to 200.
Sprinkler work filed in conjunction with M01146523-I1 for interior renovation of existing community facility offices at 6th floor as shown on plans filed herewith.
- CAP AND REMOVE SHOWER, TUB, TOILET.- RELOCATE ONE LAV, ONE SHOWER, ONE TOILET- REPLACE ONE STOVE, ONE SINK, ONE DISHWASHER, ONE LAV, ONE TOILET
Filing for renovation at the penthouse. Work includes removal and installation of CMU walls, replacement of doors, new door lintel. NO change to use, egress, or occupancy.
Renovation of unit #42AB on the 42nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.
Plumbing work filed in conjunction with M01146523-I1 for interior renovation of existing commercial space at 6th floor as shown on plans filed herewith.
Mechanical work filed in conjunction with M01146523-I1. Distribution of mechanical ductwork for 6th floor space fitout as shown on plans filed herewith.
Structural work filed in conjunction with interior renovation of existing commercial space at 6th floor as shown on plans filed herewith. Also filed for installation on new convenience stair between the 5th and 6th floor.
Renovation of unit #42AB on the 42nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.
Interior renovation of existing commercial space at 6th floor as shown on plans filed herewith. Also filed for installation of new convenience stair between the 5th and 6th floor. No change in use egress, use or occupancy proposed under this application.
Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.
Installation of new sprinkler heads and related piping. No change in use, egress, or occupancy.
Interior renovations of partitions, ceilings and doors on existing 2nd floor archives space. No change in use, egress, or occupancy.
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT 34J, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 34J, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Removal of plumbing fixing and associated piping as shown on plans in conjunction with nonstructural interior demolition M01127191-I1.
SPRINKLER DEMO AND TEMPORARY LOOP AS SHOWN ON PLANS FILED HEREWITH.
Removal of ductwork as shown on plans in conjunction with nonstructural interior demolition M01127191-I1.
Nonstructural demolition work as shown on plans filed herewith.
Filing for the replacement of 2 cooling towers at the roof. No change to use, egress, or occupancy.
INTERIOR RENOVATION OF APARTMENT 35B ON THE 35TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 35B ON THE 35TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Interior renovations to existing apartment #40C. Work to include interior non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress or occupancy.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 18B ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 18B ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Repair of existing Type 1 kitchen hoods, including connecting a replacement hood to an existing exhaust system and roof exhaust termination at the Rose Cafe. No change of use, egress or occupancy.
Interior renovation of exisint apt 29D on the 29th floor, architectural/ Construction .with minor plumbing repair
Minor Plumbing work and Sprinkler work associted with the residential hall renovation on floors 17-19, 28. No change in use, egress, or occupancy.
Minor Plumbing work and Sprinkler work associted with the residential hall renovation on floors 17-19, 28. No change in use, egress, or occupancy.
Removal and installation of non-load bearing partition walls, doors, ceiling, fixtures, millwork, and flooring on dormitory floors 16-19, 28-29 Removal of a part of abandoned trash shute, new kitchenette on 28 floors. No change of use, egress, occupancy.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 21D ON THE 21ST FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 21D ON THE 21ST FLOOR. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.