153 1 AVENUE, Manhattan, NY, 10003 · New York City · 15 total events
Partial first floor: Minor demolition of partitions & finishes with installation of new walls, office storefronts; remove & replace bathroom walls/ceilings, floors & fixtures. Partial cellar floor: remove ceilings & floors & new walls, floors & ceiling.
Interior removal of existing partitions and installation of some new walls. See comments for PAA description
Remove nonstructural partition and install new door. See comments for PAA description
Renovation of 5th floor to include but not limited to painting, new flooring, new lighting, new ceilings, new walls and new doors. See comments for PAA description
DRAWINGS ARE FILED FOR THE INSTALLATION OF NEW MECHANICAL EQUIPMENT ON THE THIRD THROUGH SEVENTH FLOORS AND ROOF. NO CHANGE TO EGRESS, OCCUPANCY, OR USE GROUP.
test
test
Remove portions of existing non-bearing partitions and install new partitions on a portion of the 3 floor. PAA description in comments
test
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
test
test
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION