PMM/PS137K - FOR Temporary stabilizing components SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#140967 . NO CHANGE IN USE, OCCUPANCY OR EGRESS
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
Shoring of excavation / underpinning in conjunction with new elevator project
INSTALLATION OF PIPE SCAFFOLD FOR ACCESS TO AREAS OF WORK
INSTALLATION OF CONSTRUCTION FENCE FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
New addition foundation walls, excavation and backfill, concrete basement slab on grade, floor framing for floors 1-4, reinforce masonry exterior bearing walls, steel support columns, window and door lintels etc.
Energy Code Compliance - Lighting and controls
PS 137: Plumbing work in conjunction with new addition to school as per plans. No change in use egress or occupancy under this application.
PS137: Installation of HVAC system for building addition. No change in use egress or occupancy.
Project is a full program accessibility project which includes a new 4 story plus basement elevator addition, to provide access to the school at all floor levels. Additional scope includes bathroom upgrades, office reconfigurations, new accessible doors
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT