1461 1 AVENUE, Manhattan, NY, 10075 · New York City · 35 total events
FOUNDATION FOR PROPOSED NEW BUILDING CONSTRUCTION. FOUNDATION SYSTEM CONSISTING OF REINFORCED CONCRETE MAT FOUNDATION, FOUNDATION WALLS, AND SLABS REQUIRED TO BRACE THE FOUNDATION WALLS.
TEMPORARY SUPPORT OF EXCAVATION FOR THE PROPOSED NEW BUILDING CONSTRUCTION.
HEAVY DUTY SIDEWALK SHED DURING BLDG DEMOLITION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON SIDEWALK/ROADWAY
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SINGLE 2500 # CAPACITY MATERIAL ONLY HOIST DURING BLDG DEMOLITION, FILED SEP. MATERIAL HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING BUILDING DEMOLITION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SCAFFOLD FILED SEPARATELY.
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BOX BUILDING ENTRANCE DOOR TO THE BOX PHONE APPLICATION IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
INSTALLATION OF A TEMPORARY DRY SPRINKLER LOOP ON THE CELLAR AND SUB-CELLAR LEVEL AT MSKCC AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
MPP 139: INTERIOR DEMOLITION OF NON-STRUCTURAL BUILDING ELEMENTS WITH USE OF MECHANICAL EQUIPMENT TO PREPARE BUILDING FOR FULL DEMOLITION, FILED SEPARATELY UNDER M00924249-I1. EQUIPMENT USE FILED SEPARATELY UNDER M00927298-S1.
MPP 129: CONSTRUCTION & INSTALLATION OF (2) DEBRIS CHUTES AT SLOAN HOUSE (DC#1) AND SCHOLAR'S RESIDENCE (DC#2) AS PER PLANS FOR USE DURING DEMOLITION, FILED SEPARATELY.
MPP 129: USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMOLITION, FILED SEPARATELY UNDER M00927298-I1.
MPP 139: FULL DEMOLITION OF (2) TOWER MEMORIAL SLOAN-KETTERING SLOAN HOUSE (20-STORY) & SCHOLARS RESIDENCE (23-STORY) USING MECHANICAL MEANS.
PARTIAL DEMO MEANS & METHODS TO PREPARE BUILDING FOR FULL DEMOLITION, FILED SEPARATELY UNDER M00924249-I1.
MECHANICAL EQUIPMENT USE FOR FULL DEMOLITION, FILED SEPARATELY.
MPP 129: USE OF MECHANICAL DEMOLITION EQUIPMENT DURING PARTIAL DEMOLITION & PLANTER REMOVAL (M00927298-Z2)
REMOVAL OF BULKHEAD/ROOFTOP MECHANICAL EQUIPMENT AND SCREENWALL USING HAND TOOLS ONLY AS PER PLANS.
EQUIPMENT USE DEMO HOIST-CARS A&B: DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG DEMO, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
EQUIPMENT USE DEMO HOIST-CARS C&D: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG DEMO, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP.
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filing drawings herewith to convert existing wet standpipe to dry standpipe for demolition of the building for Memorial Sloan Kettering.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Filing to remove and replace all existing cracked, spalled or otherwise damaged bricks at all elevations of the stair/elevator bulkhead on the Roof.
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
INSTALLATION OF HEAVY DUTY 256 LF SIDEWALK SHED AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
ILLUMINATED NON ADVERTISING ACCESSORY DIRECTIONAL SIGN FOR HOSPITAL - MEMORIAL SLOAN KETTERING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.