HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
HEREBY FILING FOR INTERIOR DEMOLITION/RENOVATION OF COMMERCIAL SPACE. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Plumbing modifications to take place on the 12th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
Architectural modifications to take place on the 12th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
Sprinkler modifications to take place on the 12th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to take place on the 12th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
TEMPORARY SPRINKLER SYSTEM FOR 006 FLOOR. TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF).
Installation of new storefront signage for Montblanc on ground level of Madison Ave and 59th St facades
Plumbing work on the 17th floor (Hermes) as indicated on drawings.
Architectural work on the 17th floor (Hermes) as indicated on drawings
Mechanical work on the 17th floor (Hermes) as indicated on drawings.
Mechanical modifications and associated duct work as per plans. No change in use egress or occupancy.
Sprinkler modifications as per plans. No change in use egress or occupancy.
Plumbing modifications as per plans. No change in use egress or occupancy.
New metal stud and plywood temporary construction fence on Madison Ave and 59th St.
INSTALLATION OF 3 TON SPIT SYSTEM ON THE 7TH FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY 72' HIGH PIPE SCAFFOLD ORIGINATING (OFF 8TH FLOOR) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.