1374 1 AVENUE, Manhattan, NY, 10021 · New York City · 111 total events
Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
Interior alterations for the modifications to the Plumbing and Sprinkler systems on the 6th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Modifications to the Mechanical System on the 6th floor as per plans submitted herewith.
Interior alterations for the modifications to the Plumbing and Sprinkler systems on the 6th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
PROPOSED GENERAL CONSTRUCTION WORK ON THE 6th FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical Systems alterations on the 5th and 7th Floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Modifications to the existing Sprinkler and Plumbing systems as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
PROPOSED GENERAL CONSTRUCTION WORK ON THE 5th and 7th, and 8th FLOORS AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary platform for the Ralph Lauren showroom. Removed at the end of the programing. No changes to existing structures, use or egress.
PROPOSED MINOR GENERAL CONSTRUCTION ON THE 9TH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Structural work on the 7th and 8th floors to infill stair slabs as indicated on drawings.
Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
Mechanical Systems alterations on the 5th Floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Modifications to the existing Sprinkler and Plumbing systems as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
PROPOSED GENERAL CONSTRUCTION WORK ON THE FIFTH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to the existing Plumbing and Sprinkler systems in the cellar level as per plans submitted herewith.
Modifications to the existing Plumbing and Sprinkler systems in the cellar level as per plans submitted herewith.
Modifications to the existing HVAC System with installation of new equipment and related duct work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
PROPOSED GENERAL CONSTRUCTION WORK ON THE CELLAR LEVEL AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - ROGER VIVIER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
PROPOSED MINOR GENERAL CONSTRUCTION ON THE 9TH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Tod's - Roger Vivier Buildout - Construction work on the 1st floor as indicated on drawings.
Tod's - Roger Vivier Buildout - Structural work on the 1st floor as indicated on drawings.
Tod's - Roger Vivier Buildout - Sprinkler work on the 1st floor as indicated on drawings.
LLW BC Partners - Plumbing work on the 3rd floor as indicated on drawings.
Tod's demo for Roger Vivier - Interior demolition of non load bearing partitions on the 1st floor as indicated on drawings.
LLW BC Partners - Construction work on the 3rd floor as indicated on drawings.
Tod's - Roger Viver Buildout - Mechanical work on the 1st floor as indicated on drawings.
LLW BC Partners - Sprinkler work on the 3rd floor as indicated on drawings.
LLW BC Partners - Mechanical work on the 3rd floor as indicated on drawings.
Mechanical work to relocate mechanical piping on the 3rd and 4th floors as indicated on drawings.
Tod's PH2 - Sprinkler work on the 1st floor as indicated on drawings.
Tod's PH2 - Structural work on the 1st floor as indicated on drawings.
Tod's PH2 - Construction work on the 1st floor as indicated on drawings.
Installation of new plumbing devices and associated piping on the 26th floor as indicated on drawings.
Tod's PH2 - Mechanical Work on the 1st floor as indicated on drawings.
Tod's PH2 - Installation of 6 foot deep fence extending more than 3 feet outside of the property line as indicated on drawings.
SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR AS INDICATED ON DRAWINGS.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE (CELINE) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Minor mechanical work on the 1st floor (Todds) as indicated on drawings.
Tods - Construction work on the 1st floor as indicated on drawings.
Tods - Installation of construction fence 3'.0 from property.
Mechanical changes (associated ductwork and piping) on the 26th floor as indicated on drawings.
Architectural changes on the 26th floor as indicated on drawings.
STRUCTURAL MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SPRINKLER MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.