1374 1 AVENUE, Manhattan, NY, 10021 · New York City · 22 total events
GENERAL CONSTRUCTION PLANS FILED HEREWITH TO SHOW INTERIOR ALTERATION WITHIN TENANT SPACE STE 11 ON 11TH FLOOR IN EXISTING BUILDING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Installation of partitions to separate units as per plans filed herewith. Tenant Build outs will be filed under separate applications. No change to use, egress or occupancy.
Interior removals as per plans filed herewith. No change to use, egress or occupancy
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for new plumbing work associated with Alt-CO #M00945950-I1. No change to use, egress, or occupancy.
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR FIT-OUT OF DELI (EATING AND DRINKING ESTABLISHMENT) ON THE FIRST FLOOR, CELLAR, & MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, AND OCCUPANCY.
General construction modifications taking place on the 2nd, 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy.
Mechanical modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.
Plumbing modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF NEW PLUMBING INCLUDE SANITARY, VENT, DOMESTIC H/C WATER PIPING, HOT WATER HEATER. NEW BRANCH MAINS AND SPRINKLER DISTRIBUTION ON FIRST FLOOR, MEZZANINE, AND CELLAR.
Mechancial work as shown on plans
Filing to convert a retail space and combine with an existing eating and drinking space at the 1st floor with a new accessory commercial kitchen at the cellar and cellar mezzanine.
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
FILING FOR FACADE REPAIRS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW MECHANICAL SYSTEMS INCLUDING DUCTWORK, DIFFUSERS, ROOFTOP HVAC FOR HEATING, COOLING, AND VENTILATION, TOLIET/GENERAL EXHAUST FANS ON FIRST FLOOR, MEZZANINE AND CELLAR.
INSTALLATION OF NEW PLUMBING INCLUDE SANITARY, VENT, DOMESTIC H/C WATER PIPING, HOT WATER HEATER. NEW BRANCH MAINS AND SPRINKLER DISTRIBUTION ON FIRST FLOOR, MEZZANINE, AND CELLAR.
HVAC Work on the 18th Floor as per plans filed. No change to use, egress or occupancy is involved.
Plumbing and Sprinkler work on the 18th Floor as per plans filed. No change to use, egress, occupancy is involved.
Plumbing and Sprinkler work on the 18th Floor as per plans filed. No change to use, egress, occupancy is involved.