132 EAST 119 STREET, Manhattan, NY, 10035 · New York City · 25 total events
ENTIRE BUILDING
APARTMENT ONLY
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
GARBAGE/RECYCLING STORAGE
WATER SUPPLY
ENTIRE BUILDING
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3C , 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF A KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
PROPOSED BATHROOM AND KITCHEN FINISHES RENOVATION AT UNITS; 1A, 1B, 1C, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 5D. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
Judgment: NO