1314 1 AVENUE, Manhattan, NY, 10021 · New York City · 63 total events
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Installation of outrigger for facade repair & inspection.
Minor renovation to existing bank branch, including partitions for an enclosed office and associated ceiling and finish work. No change in use, egress or occupancy.
FILING FOR MECHANICAL FIT OUT OF OFFICE SPACE ON 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Facade Restoration of exterior building wall at all four elevations and at east cooling tower wall. Guardrail replacement/repairs at various roof setbacks. No Change to use, egress, or occupancy.
Structural modifications taking place on the 2nd and 11th floor setback roofs as indicated on the drawings.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of new executive wash room for existing commercial condominium #19C. No change to use, occupancy or egress under this application.
INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR TO INCLUDE A PUBLIC ASSEMBLY SPACE AND MODIFY THE OCCUPANCY. NO CHANGE TO EGRESS
Proposed installation of temporary parapet protection extension / shield during roofing work. No change in use, egress, or occupancy for this filing for this job. It is classified here under scaffolding installation for DOB job filing purposes.
Filing for inspection/work at facade
SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Minor renovation to existing bank branch, including accessibility upgrade in the form of an accessibility lift and associated alterations. No change in use, egress or occupancy.
CELLULAR EQUIPMENT INSPECTION VIA INDUSTRIAL ROPE ACCESS
Interior Renovations of the 16th Floor as per plans: Removal of existing millwork, counters, planters and drop ceiling. Installation of new, non-structural partitions, low walls, glass doors and counter. No Change to Use, Egress or Occupancy.
REGISTERING EXISTING GAS EQUIPMENT ON FIRST FLOOR IN A EXISTING TAKE-OUT RESTAURANT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SPRINKLER WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
STRUCTURAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Construction modifications taking place on various roofs throughout the building as indicated on the drawings. Replacing the roof covering with the existing roof deck structure to remain.
APPLICATION FILED FOR MINOR INTERIOR RENOVATION OF EXISTING TAKE OUT RESTAURANT ON FIRST FLOOR OF EXIST.COMMERCIAL & OFFICE BUILDINGS AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUCTION WITH CONSTRUCTION # M00835222-I1 ON FIRST FLOOR IN A EXISTING TAKE-OUT RESTAURANT.
Minor renovation to existing bank branch, including accessibility upgrade in the form of an accessible teller station. No change in use, egress or occupancy.
FILING FOR MECHANICAL FIT OUT OF OFFICE SPACE ON 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
FILING FOR OFFICE FIT OUT OF EXISTING OFFICE SPACE ON 19TH FLOOR AS PER PLANS FILED HEREWITH. WORK INCLUDES BUT NOT LIMITED TO REMOVAL OF PARTITIONS AND CEILING AND LIGHTING SYSTEM. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
FILING FOR THE PLUMBING AND SPRINKLER WORK FIT OUT OF OFFICE SPACE ON 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY
FILING FOR THE PLUMBING AND SPRINKLER WORK FIT OUT OF OFFICE SPACE ON 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY
Modification to plumbing system are related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Reconfiguration of offices and select bathrooms, replacement of one exterior window to provide new louver for ventilation as shown on drawings filed herewith. No change in use, egress or occupancy.
PROVIDE NON-LOAD BEARING PARTITIONS, DOORS, CEILINGS, LIGHTS. PROVIDE SUPPLY AIR DIFFUSERS WITH REQUIRED DUCTWORK. NO CHANGE IN USE, EGRESS,OCCUPANCY OR FIRE SAFETY.
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
REMOVAL OF (3) EXISTING COOLING TOWER MAKE-UP WATER FEED ASSEMBLIES, CONSOLIDATION TO SINGLE FEED WITH (1) WATER METER AND (1) BFP ASSEMBLY TO FEED ALL (3) COOLING TOWERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
15 EXISTING SPRINKLER HEADS TO BE RELOCATED. 4 NEW SPRINKLER HEADS TO BE PROVIDED. NO CHANGE IN USE, EGRESS,OCCUPANCY OR FIRE SAFETY.
PROVIDE NON-LOAD BEARING PARTITIONS, DOORS, CEILINGS, LIGHTS. PROVIDE SUPPLY AIR DIFFUSERS WITH REQUIRED DUCTWORK. NO CHANGE IN USE, EGRESS,OCCUPANCY OR FIRE SAFETY.
Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 18th floor (Austrian Mission to the UN) as per plans. No change to use, egress or occupancy.
HVAC removals on the 18th floor (Austrian Mission to the UN) as per plans. No change to use, egress or occupancy.
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Structural modifications associated with steel support for telescoping wall as shown on drawings filed herewith. No change in use, egress or occupancy.
Construction of an interior partition to create a conference room as shown on drawings filed herewith. No change in use, egress or occupancy.
Erect non-illuminated accessory business sign on wall; copy reading Chase with Logo
Removal of existing sprinkler heads with installation of a temporary loop on the 18th floor (Austrian Mission to the UN) as per plans. No change to use, egress or occupancy.
Removal and disposal of existing plumbing fixtures on the 18th floor (Austrian Mission to the UN) as per plans. No change to use, egress or occupancy.
Installation of ductwork and HVAC system in existing office space
REPLACEMENT OF COOLING TOWER CELLS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN RELATION TO RENOVATION OF SUITE 13D LOCATED ON THE 13TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY
THIS SUBSEQUENT APPLICATION IS FILED TO CHANGE THE OWNER NAME. NO CHANGES TO APPROVED APPLICATION M00297156 PLANS G-002.00, DM-001.00, P-001.00, DM-001.00, P-001.00, P-002.00.
Installation of new sprinkler heads as shown on drawings filed herewith. No change in use, egress or occupancy.
Modification to HBAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.