1311 1 AVENUE, Manhattan, NY, 10021 · New York City · 6 total events
TEMPORARY INSTALLATION OF PIPE SCAFFOLD AND A SIDEWALK SHED AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD AND SHED TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
TEMPORARY INSTALLATION OF PIPE SCAFFOLD AND A SIDEWALK SHED AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD AND SHED TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
REMOVAL OF SPRINKLER SYSTEM FROM FLOOR 001-005, CELLAR, AND SUB-CELLAR.
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
FILING INTERIOR REMOVAL OF NON LOAD BEARING PARTITIONS FOR FLOORS CEL. 001-005 AS SHOWN PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF SIDEWALK SHED