INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
ENTIRE BUILDING
INSTALLATION AND USE OF TEMPORARY ALUMA SHORING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY MINI MOBILE CRANE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALL SPRINKLER AND STANDPIPE SYSTEMS. FILED IN CONJUCTION WITH NEW BUILDING # 121190567.
INSTALL SPRINKLER AND STANDPIPE SYSTEMS. FILED IN CONJUCTION WITH NEW BUILDING # 121190567.
INSTALLATION OF TEMPORARY AIR PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM. FILED IN CONJUNCTION WITH NB# 121190567.
Application for the installation and use of supported scaffold as per plans filed herein. No change in egress, use or occupancy.
TEMPORARY INSTALLATION OF SUPPORTED PIPE SCAFFOLD AS SHOWN ON PLANS. SHALL COMPLY WITH BSA-362-44-SM, LL-33/91, CHAP 33, SECTION 33 OF 2014 NYC DOB BC & TPPN # 9/99. NO CHANGE IN EGRESS, OC
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 7000 LB DUAL PERSONNEL/MATERIAL HOIST CAR AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Installation of boiler as per plans filed herewith. No change to use, egress or occupancy. Filed in conjunction with NB#.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 600PSF HEAVY DUTY SIDEWALK SHED FOR STORAGE OF MATERIALS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Installation of pre-manufacture platform installation in conjunction with NB and minicrane installation. No change in use, egress or occupancy
Installation of mini crane filed here in. No change in egress use or occupancy.
INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY FENCE DURING NB CONSTRUCTION, FILED SEPARATELY. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.DOT PERMITS BY OTHERS FOR FENCE ON ROADWAY.
Underground plumbing only as per plans filed. No change in use egress or occupancy. Filed in conjunction with NB #121190567.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019