130 EAST 12 STREET, Manhattan, NY, 10003 · New York City · 12 total events
Filing herewith to amend existing C of O to reflect religious establishment on 1st and cellar. Mechanical, structural, plumbing, and sprinkler work to be filed as subsequent applications.
0 infested unit(s) reported
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Relocate and install plumbing fixtures and sprinklers at Cellar and 1st floor indicated on drawings filed herewith. No change in Use Egress or occupancy under this application.
Remove stair and seal opening in ceiling installed under alt # 102862813. No change in use, occupancy or egress.
Relocate and install plumbing fixtures and sprinklers at Cellar and 1st floor indicated on drawings filed herewith. No change in Use Egress or occupancy under this application.
Install HVAC Units indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
Structural work to provide framing and elevator pit for the proposed elevator from cellar to 1st floor.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY 104' HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.