Modifications to the existing sprinkler system on the 8th Floor, as per plans. No change to use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings, and finishes on the 8th Floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 8th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system and existing standpipe on the 9th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system on the 9th Floor, as per plans. No change to use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings, and finishes on the 9th Floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 9th Floor, as per plans. No change to use, egress, or occupancy.
Alteration of HVAC units and associated piping
Interior renovation to existing kitchen and bathrooms, including replacing fixtures in kind and installation of new washer.
Interior renovation of apartment 24A. Including but not limited to, removal of non load bearing partitions, new finishes, kitchen renovation, refinishing of existing bedrooms and bathrooms. No change to use, occupancy, egress or bulk
Minor demolition with installation of new partitions, doors, suspended ceilings, and finishes on the 2nd Floor (Samlyn Capital) as per plans. No change to use, egress or occupancy.
REPLACEMENT OF TWO WATER COOLING AC UNITS IN THE LOBBY AND FLOOR 013 WITH A TOTAL CAPACITY OF 18 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT24A, INCLUDING CONSTRUCTION OF NON-LOAD BEARING PARTITIONS, UPDATING OF FINISHES AS INDICATED ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the cellar and 6th floors (LL Work) as per plans. No change to use, egress or occupancy.
Mechanical work in conjunction with General Construction Alteration DOB#M01173991-I1. There is no change in use or occupancy under this application.
Exterior Wall Tiebacks
PROPOSED ALTERATION FOR THE INTERIOR RENOVATION OF THE EXISTING APARTMENT UNIT 16D ON THE 16TH FLOOR. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION
PROPOSED PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION DOB# M01173991-I1 FOR THE INTERIOR RENOVATION OF THE EXISTING APARTMENT UNIT16D ON THE 16tH FLOOR. THERE IS NO CHANGE OF USE OR OCCUPANCY UNDER THIS APPLICATION.
Modifications to the existing plumbing system on the 7th floor (Nest) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 7th floor (Nest) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 7th floor (Nest) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 7th floor (Nest) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 1st floor (FRATO) as per plans. No change to use, egress or occupancy.
Installation of new sprinkler heads and associated piping on the 1st floor (FRATO) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 1st floor (FRATO) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (FRATO) as per plans. No change to use, egress or occupancy.
Installation of new plumbing fixtures and associated piping on the 5th and 7th floors (Vera Wang) as per plans. No change to use, egress or occupancy.
Installation of new sprinkler heads and associated piping on the 5th and 7th floors (Vera Wang) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 5th and 7th floors (Vera Wang) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 5th and 7th floors (Vera Wang) as per plans. No change to use, egress or occupancy.
Installation of new sprinkler heads and associated piping on the 6th floor (Morgan Stanley) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system as per plans. No change to use, egress or occupancy.
DEMOLISH INTERIOR PARTITIONS, CEILINGS, FINISHES, AND RESTROOM PLUMBING FIXTURES & ACCESSORIES. DEMISE THE 7TH FLOOR FOR SEPARATE TENANTS, PROVIDING A PUBLIC CORRIDOR, ELEVATOR LOBBY, AND RENOVATED RESTROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Modifications to the existing HVAC system as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping on the 1st floor (East Retail Demo) as per plans. No change to use, egress or occupancy.
HVAC removals on the 1st Floor (East Retail Demo) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, suspended ceilings, finishes and bank vault on the 1st floor (East Retail Demo) as per plans. No change to use, egress or occupancy.
Removal of existing sprinkler heads and piping with installation of a temporary loop on the 1st floor (East Retail Demo) as per plans. No change to use, egress or occupancy.
INSTALLATION OF SPLIT SYSTEM AIR CONDITIONG UNITS AND WATER COOLED HEAT PUMP UNITS.
Installation of new partitions, doors, suspended ceilings and finishes on the 6th floor (Morgan Stanley) as per plans. No change to use, egress or occupancy.
Installation of new plumbing fixtures and associated piping on the 6th floor (Morgan Stanley) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 6th floor (Morgan Stanley) as per plans. No change to use, egress or occupancy.
INTERIOR RENOVATION OF EXISTING UNIT AT 37TH FLOOR INCLUDING MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 3rd and 6th floors (Solar Capital) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 6th floor (Solar Capital) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 3rd and 6th floors (Solar Capital) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 3rd and 6th floors (Solar Capital) as per plans. No change to use, egress or occupancy.
Architectural modifications on the 6th floor (Restrooms & Hallway) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 6th floor (Restrooms & Hallway) as per plans. No change to use, egress or occupancy.