129 WEST 142 STREET, Manhattan, NY, 10030 · New York City · 36 total events
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCYTHE SIDEWALK SHED IS AT WEST 142ND STREET, FRONT OF THE BUILDING ELEVATION.
BETA-MAX HOIST INSTALLED IN ORDER TO LIFT THE COPING STONES. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
SLOW LEAK
HEAVY FLOW
ENTIRE BUILDING
ENTIRE BUILDING
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
ENTIRE BUILDING
APARTMENT ONLY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCHSET AT FRONT ENTRANCE DOOR TO BUILDING
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
ENTIRE BUILDING
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
LIMITED EXTERIOR REPAIR & ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ENTIRE BUILDING
INSTALLATION OF NEW BOILER FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT:INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
BOILER REPLACEMENT FILED IN CONJUNCTION WITH RENOVATION OF 6-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
INSTALLATION OF NEW SIDEWALK SHED AT 129 WEST 142ND STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 129 WEST 142 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 129 WEST 142 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019