1282 1 AVENUE, Manhattan, NY, 10065 · New York City · 52 total events
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 03 through 06. Construction costs and filing fees included in full-floor Mechanical job #M01293886-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 20 through 23. Construction costs and filing fees included in full-floor Mechanical job # M01293923-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 09 through 11. Construction costs and filing fees included in full-floor Mechanical job #M01294935-S1. No change in use, egress, or occupancy in this application.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1. No change in use, egress, or occupancy in this application.
Filing for installation of new facade curtain wall and Energy compliance review of building Envelope Energy Model as per plans filed herewith. No change to use, egress, or occupancy.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SYSTEMS INCLUDE DUCTWORK AND DISTRIBUTION.
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING INTERIOR DEMO, FILED SEPARATELY UNDER M01296642-I1.
Filing for removal of interior non load-bearing partitions, doors, and finishes, except for escalators being removed between FL01 and FL02. No change to use, egress, or occupancy.
THE PLUMBING SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OF EXISTING MEP SERVICES. THE SERVICES INCLUDE SANITARY, VENT, HW, CW DISTRIUBUTION ALONG WITH PLUMBING EQUIPMENT.
THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT.
THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT.
Filing herewith for installation of Temporary Dry Standpipe for fire protection during ongoing demolition and construction as part of redevelopment project.
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filing herewith General Construction for temporary conditions inclusive but not limited to partitions, doors, and hardware for interior non-structural debris removal through Madison Avenue.
EQUIPMENT USE CARS# 5&6: DUAL 10250# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
HEAVY DUTY URBAN SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. URBAN SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
EQUIPMENT USE CARS# 3&4: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CARS 1-6: TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. HOIST & ELEVATOR FILED SEP.
EQUIPMENT USE CARS# 1&2: DUAL 7500# CAPACITY PERSONNEL HOISTS DURING BLDG ALT, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPL. SUBMITTED SEPARATELY.
Filing herewith for the removal of the existing building's envelope curtainwall system.
Filing herewith for the removal of the existing building's envelope curtainwall system.
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED AT (270 PARK AVENUE). SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Minor ductwork additions/alterations and air balancing. No change in use, egress or occupancy
Filing herewith non-load bearing demised partitions to existing offices and/or misc. rooms for the installation of new furniture, inclusive of related finishes, with power & lighting modifications to accommodate new layouts as per plans.
Interior renovations on part of 37th floor as indicated on attached plans. There is no change in egress, use or occupancy.
Interior mechanical renovations on part of 37th floor as indicated on attached plans. There is no change in egress, use or occupancy.
Modification to HVAC/Mechanical systems on part of 1st floor (lobby) as indicated on attached plans. There is no change in egress, use or occupancy.
Modification to sprinkler systems on part of 1st floor (lobby) as indicated on attached plans. There is no change in egress, use or occupancy.
Interior renovation of part of 1st floor related to re-installation of turnstiles and installation of a new security closet as indicated on attached plans. There is no change in egress, use or occupancy.
Modifications and additions to associated ducts and piping as per plans filed herewith. NO change in use, egress or occupancy.
Plumbing & sprinkler modifications as per attached plans. There is no change in use, egress or occupancy.
Interior renovation on 22nd floor as indicated on attached plans. There is no change in occupancy, use or egresd
Mechanical/HVAC modifications as indicated on the attached plans. There is no change in use egress or occupancy.
Plumbing & sprinkler modifications as per attached plans. There is no change in use, egress or occupancy.
New Sanitary drain on the 16th floor serving an existing drain located on the 17th Floor. In addition, there will be a new drip pan and leak detector.Scope of new sanitary line is to be installed within a portion of the 16th floor (~ within a 2,000 sq.ft.
Modifications to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Structural review of proposed main lobby slab penetrations including reinforcement. No change in use, egress or occupancy.
water piping on the 2nd floor
Added/removed 10 feet of duct work. No change in egress, use or occupancy.
Removed, replaced, relocate, new fixtures. 1st Floor; (4)sinks, (3) floor drain, (1) ice maker,sanitary piping, water piping. C1 level; (1) floor drain, (1) electric water heater, (1) grease trap, sanitary piping, water piping. C2 level; sanitary piping.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.