1280 1 AVENUE, Manhattan, NY, 10065 · New York City · 130 total events
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Modify mechanical ductwork and related piping. No change in use, egress or occupancy.
Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.
Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.
Modify mechanical ductwork and related piping. No change in use, egress or occupancy.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Removal of hydrogen gas detection system and related ductwork on floor 8C/11M as per plans.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Installation of 2 fire hose cabinets and related piping. No change in use, egress or occupancy.
Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.
Removal of non-bearing interior partitions and associated finishes. No change in use, egress or occupancy.
Modify mechanical ductwork and associated piping as per plans. No change in use egress or occupancy.
Demolition and installation of non-bearing interior partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.
Add and remove ductwork and diffusers as per plans. No change in use, egress or occupancy.
Modify mechanical ductwork and related piping. No change in use, egress or occupancy.
Interior demolition and installation of non-bearing partitions, doors and finishes at NE corner. No change in use, egress or occupancy.
Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.
Structural work as per plans. No change in use, egress or occupancy.
Modify mechanical ductwork and related piping. No change in use, egress or occupancy.
Support for Modernfold partition, support of (1) high density file system, and localized trenching for power. No change in use, egress or occupancy.
Modify mechanical ductwork and related piping. No change in use, egress or occupancy.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Structural work as per plans including: support of slab openings for MEP, support of new interior storefront and support of new garage doors.
Structural work as per plans
Removal and installation of interior partitions and finishes as per plans. Area of 1st floor increased by 470SF. Floor area relocated from 6th floor (filed under M01006077-I1). No change in use, egress or occupancy.
Exterior Facade work as per plans. No change in use, egress or occupancy.
Mechanical work as per plans. No change in use, egress or occupancy.
Removal and installation of interior partitions and finishes at the 6th floor and new elevator openings at 7 & 27th floors. No change in use, egress or occupancy.
Mechanical work as per plans. No change in use, egress or occupancy.
Alt 2 work for floor densification project
Ductwork modification
Modify sprinkler heads and related piping at NE corner. No change in use, egress or occupancy.
Application filed for chiller replacement. No change in use, egress or occupancy.
Alteration-CO to establish Place of Assemblies on floors 6 & 7 Construction (8 & 10 Marketing) with minor interior renovations of non-loading bearing partitions and doors on the 7th floor only. Refer to comments for additional information.
INSTALLATION OF TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
Application filed for retrofit of existing steam coil. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to plumbing system as per plans. No change in use, egress or occupancy.
Sprinkler modification as per plans.. No change in use, egress or occupancy.
Plumbing work as per plans.. No change in use, egress or occupancy.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Modification to sprinkler system as per plans.
Modification of existing gas system to supply new gas appliances in 7th floor (10M) commercial kitchen as per plans. No change in use, egress or occupancy.
Replacement of air conditioning units for 34th floor Data Center. No change in use egress and occupancy
Modify sprinkler heads and related piping per plans filed herewith. No change in use, egress or occupancy.