INSTALLATION OF A TEMPORARY ROOF PROTECTION SYSTEM OVER EXISTING ROOF & OCCUPIED DECKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Temporary structures for a WSJ event at MoMA. Removed at the end of the programing. No changes to existing structures, use or egress.
Modification to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/additions to existing sprinkler system and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal and installation of non-load bearing partitions, doors/frames, ceiling/lighting and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
THE MODIFICATION OF EXISTING DUNNAGE TO SUPPORT NEW MEP EQUIPMENT, NEW PLATFORMS TO ACCESS MEP EQUIPMENT AND THE MODIFICATION OF EXISTING FRAMING SUPPORTING GRATING AT THE 16TH FLOOR AND PENTHOUSE LEVELS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
THE REPLACEMENT OF FOUR COOLING TOWERS, FIVE EXHAUST AIR AND TWO SUPPLY AIR FANS ON THE ROOF (16TH FLOOR). A VAV AIR TERMINAL UNIT ADDITION TO SERVE NEW ELECTRICAL ROOM ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
REMOVAL AND REPLACEMENT OF EXISTING ROOF MEMBRANE AND FLASHING, ETC. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF MATERIAL HOIST (COUNTERWEIGHTED SYSTEM).
MOMA, Roof repairs at floors 4, 6, 7 & 8 as per the plans filed including: Removal and replacement of the existing roof membrane and flashing at roof. Installation of new roof guard rails.
Temporary structures for MoMA events. Removed at the end of the programing. No changes to existing structures, use or egress.
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 6TH FLOOR FOUNDERS ROOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modification/additions to existing HVAC ductwork for the 6th floor founders room as per plans filed herewith. No change in use, egress or occupancy under this application.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary structures for a fashion show inside the MoMA. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for a WSJ event at MoMA. Removed at the end of the programing. No changes to existing structures, use or egress.
Modification to existing sprinkler system on the 7th floor as per plans filed herewith. No change in use, egress or occupancy under this application.
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modification/additions to existing HVAC ductwork for the 7th floor as per plans filed herewith. No change in use, egress or occupancy under this application.
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 14 FLOOR (NORTH OFFICE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Minor mechanical modifications to existing HVAC ductwork. No change in use, egress or occupancy under this application.
Interior renovations to provide accessible routes to stage for existing Titus theaters. No change in use, egress or occupancy under this application. Refer to comments for additional information.
Installation of air conditioning split system for the mezzanine office area. No change in use egress and occupancy.
Installation of temporary sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
MOMA, Exterior facade repairs (floors 01 to 07 only) as per the plans filed including: Removal and replacement of displaced face brick masonry. Stone crack & spall repair.
Modification to existing sprinkler system on the 14th floor (North Office). No change in use, egress or occupancy under this application.
Modification to existing HVAC ductwork for the 14th floor (North Office) as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing sprinkler system. No change in use, egress or occupancy under this application.
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 14 FLOOR (SOUTH OFFICE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modification to existing HVAC ductwork as per plans filed herewith. No change in use, egress or occupancy under this application.
INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS AT SHAFT AREA OF THE BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPER 33 OF THE 2014 NYC BUILDING CODE.
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.