120 CABRINI BOULEVARD, Manhattan, NY, 10033 · New York City · 119 total events
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 67, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST
CAP AND REMOVE 1 GAS RANGE. FILED IN CONJUNCTION WITH GC JOB M01308902-I1 TO COMBINE APARTMENTS. ALL AS PER PLANS FILED HEREWITH.
Modifications to kitchen and bathroom plumbing fixtures in apt. 121 as per plans. No change to use, egress or occupancy is involved.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
Application for the installation and use of suspended scaffold for facade repair and inspection.
Facade repair and inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
subsequent ST filed to satisfy partial demo requirement for -I1 GC facade repair application (lintels and parapet).
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 180 CABRINI BOULEVARD, MANHATTAN.
Application filed for facade and roof repairs as per drawings filed herewith.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 160 CABRINI BOULEVARD, MANHATTAN.
Application filed for facade and roof repairs as per drawings filed herewith.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 120 CABRINI BOULEVARD, MANHATTAN.
Application filed for facade and roof repairs as per drawings filed herewith.
Application filed for facade and roof repairs as per drawings filed herewith.
PROPOSE TO COMBINE APARTMENTS 74 AND 75 WITH 1 DOORWAY AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRERSS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 200 CABRINI BOULEVARD, MANHATTAN.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AND FACADE INSPECTION AT 140 CABRINI BOULEVARD, MANHATTAN.
PLUMBING SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED HEREWITH. PLUMBING SCOPE IS FILED AS A SUBSEQUENT APP# M00726155-S1. NO CHANGE TO USE EGRESS OR OCCUPANCY.
ARCHITECTURAL SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED HEREWITH. PLUMBING SCOPE IS FILED AS A SUBSEQUENT APP# M00726155-S1. NO CHANGE TO USE EGRESS OR OCCUPANCY.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 77, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
This application is filed for the Architectural scope associated with the apt.78 interior renovation. No change in use, egress, or occupancy.
Combining 2 apartments, 55 and 56, removal and installation of interior non load-bearing wall as per Memo of 3/97
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PLUMBING WORK IN THE CELLAR, PLUMBING WORK INCLUDES NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK IN THE CELLAR, PLUMBING WORK INCLUDES INSTALLATION OF NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK IN THE CELLAR,. PLUMBING WORK INCLUDES NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
PLUMBING WORK IN THE CELLAR. PLUMBING WORK INCLUDES INSTALLATION OF NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK IN THE CELLAR, PLUMBING WORK INCLUDES INSTALLATION OF NEW FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HERWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, MASONRY REPAIR AT ALL BUILDING ELEVATIONS, PARAPET REBUILDING AND STRING COURSE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, MASONRY REPAIR AT ALL BUILDING ELEVATIONS, PARAPET REBUILDING AND STRING COURSE REPLACEMENT AS PER PLANS FILED HEREWITH.
WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, MASONRY REPAIR AT ALL BUILDING ELEVATIONS, PARAPET REBUILDING AND STRING COURSE REPLACEMENT
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 67, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Apt UNIT 122 — Possession
INSTALL SPRINKLER PIPING & 3 HEADS IN LAUNDRY ROOM; CONNECT TO STANDPIPE. NO CHANGE IN USE,EGRESS OCCUPANCY.
Furnish and install new gas header in cellar with new takeoff valves. Furnish and install new gas riser complete with branch piping and appliance shutoff valves. Typical for 9 risers. Test all new gas piping. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL SPRINKLER PIPING & 3 HEADS IN LAUNDRY ROOM; CONNECT TO STANDPIPE. NO CHANGE IN USE,EGRESS OCCUPANCY.
This application is filed for the Combination and Interior Renovation of apartments 65/65 associated with the PL scope of work. No change in use, egress, or occupancy under this application. (TPPN #3/97)
This application is filed for the Combination and Interior renovation of apartments 65/65 associated with the GC scope of work. No change in use, egress, or occupancy under this application. (TPPN #3/97)
INSTALL SPRINKLER PIPING & 3 HEADS IN LAUNDRY ROOM; CONNECT TO STANDPIPE. NO CHANGE IN USE,EGRESS OCCUPANCY.
Plumbing work file in conjunction with cottage#2 renovation as per plans filed herewith.
Furnish and install new gas header in cellar with new takeoff valves. Furnish and install new gas riser complete with branch piping and appliance shutoff valves. Typical for 9 risers. Test all new gas piping. NO CHANGE IN USE, EGRESS OR OCCUPANCY.