12 5 AVENUE, Manhattan, NY, 10011 · New York City · 23 total events
0 infested unit(s) reported
Exterior facade repair work as per plan. No change to use, egress or occupancy under this application.
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of suspended scaffold for facade work or inspection
PESTS
PESTS
ENTIRE BUILDING
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE BATHROOM LOCATED AT APT 73, 7th STORY, 1st APARTMENT FROM SOUTH AT WEST
WIRING
BASIN/SINK
CEILING
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PESTS
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
APARTMENT ONLY
APARTMENT ONLY
ENTIRE BUILDING
APARTMENT ONLY
ENTIRE BUILDING
§ 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND INSTALED ON BUILDING VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
APPLICATION FILED IN CONJUNCTION WITH ALT-1 #123802466 TO LEGALIZE SUPERINTENDENTS OFFICE, PROPOSED TOILET ROOM, SINK, AND LAUNDRY ROOM WITH ELECTRIC DRYERS. PLUMBING WORK ONLY. WORK WAS DONE 100%
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019