115 EAST 119 STREET, Manhattan, NY, 10035 · New York City · 11 total events
ENTIRE BUILDING
WALL
HEAVY FLOW
PESTS
APT 2B INTERIOR RENOV AS PER PLANS. INCLDS NON-LOAD BEARING PARTITION RPLMT, INSTALL NEW GYP BRD WALL FINISH, NEW CEILING ASSEMBLY & NEW SUBFLOORING. NO STRUCT WORK. PL WORK IS SEPARATE. NO CHANGE TO EXT'G LAYOUTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
HEAVY FLOW
PESTS
PROPOSED BATHROOM AND KITCHEN FINISHES RENOVATION AT UNITS;1A, 1B, 1C, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 5D. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). defective IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Judgment: NO