1145 1 AVENUE, Manhattan, NY, 10065 · New York City · 27 total events
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
APARTMENT ONLY
General construction work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, occupancy, or use.
Hereby filing modification to existing sprinkler system. Existing piping and sprinkler head to be modified to accommodate new layout.
Filing for partial foundation on grade, structural first floor framing and Roof Dunnage framing to support the NEW Emergency Generator Equipment.
Hereby filing related architectural construction on basement, 1st and roof levels in support of replacement of rooftop emergency generator and associated equipment. No change to use, egress, or occupancy.
HEREBY FILING NEW GENERATOR , SWITCHGEAR AND RELATED PIPING PER PLAN FILED HEREWITH
Hereby filing an 8000gallon fuel storage tank for a new generator
INSTALLATION OF A TEMPORARY SCAFFOLD SYSTEM AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Installation of suspended scaffold for facade inspection/ repair.
FACADE RESTORATION INCLUDING BRICK REPLACCEMENT, MORTAR JOINT REPOINTING, WINDOW SILL REPLACEMENT, LINTEL REPLACEMENT AND CONCRETE PATCHING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Plumbing work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, use, or occupancy.
Structural work consistent with roof dunnage framing for new cooling tower as shown on drawings. No change to egress, occupancy, or use.
Mechanical work consistent with new rooftop cooling tower and associated equipment as shown on drawings. No change to egress, use, or occupancy.
Installation of AC unit with associated ductwork and piping on second floor. No roof work on this project. No change to use, occupancy or egress.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Removal an d replacement of sprinkler heads at ceiling slab on 2nd floor. No change to use, egress or occupancy.
General Construction work in relation to the installation of AC unit with associated duct and piping. No change to use, egress or occupancy.
General Construction work consistent with removal of AC units and replacement of pump packages on 6th floor and roof. No change to use, egress or occupancy.
Replacement of AC Units with associated piping on sixth floor and replacement of rooftop pump packages associated with existing dry coolers as per plans filed herewith.
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
A FACADE RESTORATION PROJECT CONISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING, WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENT, AND WINDOW LINTEL SCRAPE PRIME AND PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Removal and installation as shown in drawings filed herewith. No change to use, egress or occupancy.
REMOVAL AND INSTALLATION OF MECHANICAL EQUIPMENT, RELATED PIPING AND DUCTWORK.
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION