112 CENTRAL PARK SOUTH, Manhattan, NY, 10019 · New York City · 13 total events
HEREBY FILING FOR THE REPLACEMENT. REMOVAL AND INSTALLATION OF FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
HEREBY FILING FOR THE COMBINATION OF APARTMENTS 5A AND 5B LOCATED ON THE FIFTH FLOOR IN COMPLIANCE WITH TPPN 03/97. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Exterior facade repairs
Installation of IRA for facade inspection.
MOLD
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of suspended scaffold during facade inspection/ Repair SR23/1708
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Interior renovations of bathrooms and powder rooms. Plumbing applications to be filed separately. No change in use, egress or occupancy.
minor renovation of unit 3b2e. replacement of materials. plumbing filed under separate permit. No change in use, egress or occupancy
MINOR PLUMBING WORK FILED IN CONJUNTION WITH OT APP. #M00749765. REPLACEMENT AND RELOCATION OF FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Plumbing work in conjunction with OT work
New Chiller to replace existing Chiller in Cellar. Associated new fresh air duct work running east through cellar.