1111 1 AVENUE, Manhattan, NY, 10065 · New York City · 267 total events
Infrastructure project. Renovations, finishes as per plans filed herewith. No change in use, egress or occupancy.
SCOPE OF WORK INCLUDES SUPPORT FOR INFRASTRUCTURE SCOPE INCLUDING DEMOLITION OF NEWAND INFILL OF EXISTING PENETRATION THROUGH AN EXISTING FOUNDATION WALL.
Installation of temp tents, no alt to exist structures for Annual NYC Half Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
SCO Security Operations Center. Structural work for removal of existing masonry wall.
Installation of temporary tents, no alteration to existing structures, for the Annual Olmsted Luncheon. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
INSTALLATION OF A TEMPORARY SPRINKLER PROTECTION SYSTEM ON THE NORTH SIDE OF THE BASEMENT AT THE MET PARKING 2 STAIR PUBLIC CORE AND SHELL. AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
INSTALLATION OF A TEMPORARY SPRINKLER PROTECTION SYSTEM ON THE SOUTH SIDE OF THE BASEMENT AT THE MET PARKING 2 STAIR PUBLIC CORE AND SHELL. AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
Temporary tents for events in the courtyard of TOG. Removed at the end of the programing. No changes to existing structures, use or egress.
Plumbing and sprinkler modifications for the Met Great Hall Gallery renovations as per plans filed herewith.
Plumbing and sprinkler modifications for the Met Great Hall Gallery renovations as per plans filed herewith.
EXECUTIVE OFFICES. MODIFY EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH BUILDING ALTERATION.
MECHANICAL WORK FOR OFFICES RENOVATIONS AS PER PLANS.
ANEC. MECHANICAL WORK AS PER PLANS FILED HEREWITH.
PLUMBING WORK FOR RENOVATIONS OF EXECUTIVE OFFICES.
Restoration of the Delacorte Public Restroom. No change of use, egress or occupancy.
OFFICE RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary bracing and shoring associated with the Delacorte restroom renovation in Central Park. No change of use, egress or occupancy.
Filed herewith for minor interior alteration on existing second floor, scope of work to include temp interior partitions. Application filed in conjunction with M01060210-I1. No change in use, egress or occupancy.
STRUCTURAL WORK FOR ANEC SKYLIGHTS RENOVATIONS AS PER PLANS FILED HEREWITH.
ANEC SKYLIGHTS RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
ANEC. STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
Sprinkler and Standpipe work associated with the Harlem Meer Center Pool and Rink Complex New Building construction at Central Park.
Temporary Installations to be used on a temporary event J. Crew Holiday Market. All the Installations are to be removed upon completion of the event.
STRUCTURAL WORK FILED TO INSTALL NEW ONSTAGE LIGHTING TRUSS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical work for the Met Great Hall Gallery renovations as per plans filed herewith.
Structural work for the Met Great Hall Gallery renovations as per plans filed herewith.
MET GREAT HALL GALLERY. PROJECT SCOPE INCLUDES AN INTERIOR RENOVATION OF AN EXISTING RETAIL SHOP INTO A NEW GALLERY SPACE WITH MECHANICAL ROOM BELOW.
Interior and Exterior renovation of the North Meadow Recreation Center (NMRC) in Central Park to improve the accessibility of the building. No change of use, egress, or occupancy.
Civil sitework associated with the renovation of the North Meadow Rec Center Building in Central Park. No change of use, egress of occupancy.
SCO Security Operations Center. Modifications to existing sprinkler system.
SCO Security Operations Center. Plumbing work as per plans.
Application filed herewith to reconstruction and expansion of the existing pavers surrounding the structure to be renovated, and installation of permeable pavers, and trenching and paving for new utilities. No change to use, egress or occupancy.
APPLICATIONS FILED FOR THE PROTECTION OF THE EXISTING TREES WITHIN AND IN CLOSE PROXIMITY TO THE LIMIT OF WORK AND TO RESTORE THE LANDSCAPE AREAS WITHIN AND SURROUNDING THE THEATER. NO CHANGE IN USE,EGRESS,OR OCCUPANCY.
Foundation renovation of existing theater. No change to use, egress or occupancy.
Mechanical work associated with the renovation of the North Meadow Rec Center Building in Central Park. No change of use, egress of occupancy.
Installation of temp tent, no alt to exist structures for 2022 Winter Gala at Rumsey Playfield. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
AAOA-SPRINKLER MODIFICATIONS, MINOR PLUMBING WORK AS PER PLANS FILED HEREWITH.
GREAT HALL GALLERY - PACKAGE 2 EARLY DEMO. SOE WORK FOR PROPOSED ELEVATOR PIT IN CELLAR.
Install of temporary pedestrian scaffold bridge, no alt to exist structures for Annual NYC Marathon. TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
Structural Modifications to the public, Delacorte theatre. No change in use, egress, or occupancy.
SCO Security Operations Center. Renovations, partitions, ceilings and doors as per plans filed herewith. No change in use, egress or occupancy
SCO Security Operations Center. Modifications to mechanical system as per plans filed herewith.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Temporary structures outdoors for the We Belong Here 2025 concerts at Wollman rink Area. Removed after the programming. No change in use, occupancy egress.
Installation of temp tents, no alt to exist structures for NYC Marathon Medical Tents. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
Install of temp tents, bleachers, platforms & ancillary structures, no alt to exist structures for 2022 NYC Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
GREAT HALL GALLERY - PACKAGE 2 EARLY DEMO. MECHANICAL WORK AS PER PLANS FILED HEREWITH.
GREAT HALL GALLERY - PACKAGE 2 EARLY DEMO. STRUCTURAL WORK AS PER PLANS FILED HEREWITH.
GREAT HALL GALLERY PACKAGE 2. DEMO WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY