§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 52, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM
APARTMENT ONLY
APARTMENT ONLY
ENTIRE BUILDING
APARTMENT ONLY
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
APARTMENT ONLY
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 60' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT PUBLIC HALL, 1st STORY
ENTIRE BUILDING
ENTIRE BUILDING
0 infested unit(s) reported
VERIZON SITE MODIFICATIONS. RELOCATE (2) ANTENNA SECTORS (6 ANTENNAS AND 2 RRH UNITS TOTAL) AND (3) GPS UNITS. REPLACE (3) EXISTING ANTENNAS AND (6) EXISTING RRH UNITS. REMOVE (1) EXISTING CABINET IN EQUIPMENT ROOM ON CELLAR LEVEL.
APARTMENT ONLY
ENTIRE BUILDING
PROPOSED MODIFICATIONS TO EXISTING GAS PIPING SYSTEM AT CELLAR LEVEL AND BUILDING EXTERIOR TO ROOF IN PURSUANCE OF THE NEW GENERATOR REPLACEMENT FILED UNDER DOB APPLICATION NO. M00571974. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
REPLACEMENT OF EXISTING 35KW NATURAL GAS GENERATOR WITH NEW 50KW NATURAL GAS GENERATOR ON ROOF WITH RELATED GAS PIPING MODIFICATIONS FILED UNDER DOB APPLICATION NO. M00571976. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.