1030 3 AVENUE, Manhattan, NY, 10065 · New York City · 35 total events
ENTIRE BUILDING
ENTIRE BUILDING
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 21C ON THE 21 FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
MINOR ALTERATION TO BATHROOM; CONVERTING A TUB TO A STANDING SHOWER. PLUMBING TO BE FILED SEPARATELY UNDER AN LAA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF APARTMENT 21C ON THE 21 FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
SUBSEQUENT APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE CELLAR AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SUBSEQUENT APPLICATION FILED FOR PLUMBING MODIFICATION/ADDITIONS FOR CELLAR COMMERCIAL KITCHEN AS PER PLANS FILED HEREWITH. THIS APPLICATION WILL SUPERSEDE # 122375189. RELATED APP. # 12257024 (THIS IS TO ADDRESS ECB VIOLATION # 39003299K)
APPLICATION FILED FOR AMENDED CERTIFICATE OF OCCUPANCY FOR CHANGE OF USE/OCCUPANCY IN THE CELLAR FOR ACCESSORY COMMERCIAL KITCHEN TO 1ST FLOOR EATING AND DRINKING ESTABLISHMENT. THIS APPLICATION WILL SUPERSEDE # 122375189. RELATED APP. # 122570244
Minor non-structural partition layout changes and new finishes, fixtures and equipment throughout
APARTMENT RENOVATION INCLUDING MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES.
APARTMENT RENOVATION INCLUDING MODIFICATION AND INSTALLATION OF PARTITIONS, FLOORING, CEILING, CABINETRY, AND LIGHTING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
CEILING
DOOR
MOLD
DOOR FRAME
Renovation of an existing apartment 34A on the 34th floor- Replace plumbing fixtures and applicances
Renovation of apartment 34A. No change in use, egress or occupancy.
Garage and Vault Repairs as per plans filed herewith. No change to use, egress, or occupancy.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Temporary shoring as per plans filed herewith. No change to use, egress, or occupancy.
Remove replace and install new Plumbing fixtures in apt no #4E at 4th Floor. all as per plan. no change on use egress or occupancy.
Modifications to existing plumbing work including remove, install & replace fixtures in apts #14C and #14D combination as per TPPN 3/97. No change to use, egress or occupancy.
Minor interior partition removals and construction in conjunction with apts #14C & #14D combination as per TPPN 3/97. Remove one kitchen, create laundry area & modify closets. Install new lighting. No change to use, egress or occupancy.
Proposed plumbing work at an existing bathroom, half-bath and a kitchen
Filing PAA to reflect new shut off valve on riser diagram located on the 36th fl Construction / 39th fl Marketing.
Minor demolition with installation of new interior partitions and architectural finishes (Apt 6AB) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system (Apt 6AB) as per plans. No change to use, egress or occupancy.
Mechanical work type in conjunction with Alt 2 123747044 include a new electric duct heater with ducts at the mezzanine level supplying the first floor as per the plans- PAA filed to correct title block for this project address- no other changes
Minor plumbing work filed conjunction with job number # 140910352. No changes in use, egress, or occupancy in this application.
REPLACEMENT OF PLUMBING FIXTURES IN UNIT 14E on the 13th floor. NO CHANGE TO USE EGRESS OR OCCUPANCY.
Filing for modification of structural system in conjunction with interior demolition and general construction of units 38A & 39A- 35th floor construction/ 38 floor marketing, 36th floor construction/ 39th floor marketing as shown on plans.
INSTALLATION OF NON-ILLUMINATED WALL SIGN (NUTS FACTORY)
Plumbing in the existing commercial space at 1030 3 Avenue -Alt 2 job# 123747044 no change to use, egress of occupancy under this application
ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.