1023 1 AVENUE, Manhattan, NY, 10022 · New York City · 10 total events
INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS AT THE WEST 52ND STREET, EAST TO THE CANOPY, AND WEST 52ND STREET, WEST TO THE CANOPY.
Facade Repairs as shown in filed drawings. No change in egress, use or occupancy.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF THE SIDEWALK SHED TO THE TOP OF THE BUILDING, EAST TO THE CANOPY, WEST TO THE CANOPY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of suspended scaffold for facade work or inspection.
INSTALLATION OF PIPE SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
Installation of temporary interior supported scaffold inside theater per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AT VARIOUS LEVELS FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
REMOVE CHILLER AND COOLING TOWER,. INSTALL 2 PACKAGED AIR CONDITIONING SYSTEMS. INSTALL SPLIT-SYSTEM AIR-CONDITIONING REPLACE 2 AIR HANDLER ASSOCIATED PIPING ,POWER AND CONTROLS.. DUCT DISTRIBUTION NEW AND ALTERED. INSTALL MISCELLANEOUS UNIT HEATERS