1014 1 AVENUE, Manhattan, NY, 10022 · New York City · 187 total events
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR RENOVATION OF 17TH & 18TH FLOORS THOMSON REUTERS OFFICE AS PER PLANS
FILING FOR MECHANICAL WORK ASSOCIATED WITH 17TH & 18TH FLOOR THOMSON REUTERS OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR INTERIOR RENOVATION OF 17TH AND 18TH FLOOR THOMSON REUTERS OFFICE AS PER PLANS SUBMITTED HEREWITH.
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. Work to include new air outlets, re-balancing, and new transfer ducts.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
THIS PROJECT IS AN INTERIOR ALTERATION TO AN EXISTING TENANT SPACE IN A MULTI-STORY, FULLY SPRINKLERED, MULTI-TENANT STRUCTURE TO HOUSE NEW RETAIL TENANT PANDORA. NO CHANGE TO USE, OCCUPANCY AND EGRESS.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy.
Interior renovation to include demolition of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application.
Mechanical Modifications as per plans. No change of use egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SPRINKLER WORK AS SHOWN ON THE PLANS
MODIFICATIONS TO EXISTING SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MECHANICAL DEMOLITION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
DISMANTLE AND REMOVE SELECT SIGNS & ASSOCIATED STRUCTURES FROM EXTERIOR WALL (STEVE MADDEN - 7TH AVE & W 42ND ST). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ERECT EXTERIOR WALL STRUCTURE FOR SIGN FILED UNDER SEPARATE APPLICATION # M01051632. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL ILLUMINATED LED SCREEN ON EXTERIOR WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # M01051659. (STEVE MADDEN)
INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Plumbing work as shown on the plans.
Sprinkler work as shown on the plans.
General construction as shown on the plans. No change is use, egress, or occupancy.
Mechanical work as shown on the plans.
SPRINKLER WORK IN CONJUNCTION WITH INTERIOR RENOVATION AT CELLAR
SPRINKLER WORK ASSOCIATED WITH RENOVATION OF 16TH FLOOR OFFICES AND CAFETERIA.
Plumbing work as shown on plans in conjunction with new chiller.
Mechanical work in conjunction with new chillers as shown in plans.
PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATIONS AND MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Plumbing work as shown on plans.
Mechanical work as shown on plans.
Sprinkler work as shown on plans.
Interior renovation of 18th floor.
INSTALLATION / REMOVAL OF PIPING AND DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Plumbing work as shown on plans.
Installation of temporary interior system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler work as shown on plans.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filing for change of use and occupancy on floors 1-9 as shown on plans. Minor wall and door work as shown on plans. All buildout work to be filed separately under Alt 2 applications.
Mechanical work as shown on plans.
Interior alteration as shown on plans filed herewith.
Structural work as shown on plans.
New chilled water piping for existing and future AC units.
Installation of new door at 20th floor terrace as shown on plans.
Removal of mechanical chillers as shown on the plans