101 WEST 12 STREET, Manhattan, NY, 10011 · New York City · 39 total events
REPLACEMENT OF STEAM ABSORPTION CHILLER WITH NEW MODULAR ELECTRIC CHILLERS FOR HEATING AND COOLING. NO CHANGE IN EGRESS OR OCCUPANCY.
HEREBY FILING FOR THE RENOVATION OF UNIT 20C. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
0 infested unit(s) reported
HEREBY FILING FOR THE RENOVATION OF UNIT 20C (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GC filed for interior renovation of apartment 18L located on 18th floor of a residential building. No change in use, occupancy or egress.
Modification to interior partitions and finishes to accommodate the joining of apartments 10A and 10B in the existing building as per compliance with TPP #3/97. No change to use, egress or occupancy.
PLIUMBING DCOPE FILED IN CONUNCTIO WITH JOB #M01110344-I1, MODERATE RENOVATION OF UNIT #17H CONSISTING OF KITCHEN RENOVATION, RENOVATION OF TWO BATHROOMS AND MINOR WALL LAYOUT REVISION, AS INDICATED. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
IRA to assist with Condition Assessment
INSTALLATION OF AN ACCESSORY BUSINESS AWNING
MODERATE RENOVATION OF UNIT #17H CONSISTING OF KITCHEN RENOVATION, RENOVATION OF TWO BATHROOMS AND MINOR WALL LAYOUT REVISION, AS INDICATED. NO CHANGE TO EGRESS,OCCUPANCY OR USE.
Plumbing modifications to accommodate the joining of apartments 10A and 10B in the existing building as per plans filed herwith. No change to use, egress or occupancy.
FILE APPLICATION FOR INTERIOR RENOVATION FOR APTMENT#8J.PARTITION INVOLVED ONLY.NO CHANGE TO USE EGRESS OR OCCUPANCY.
FILE PLUMBING APPLICATION IN CONJUNCTION WITH JOB #M01075490,NO CHANGE TO USE EGRESS OR OCCUPANCY
INSTALLATION OF A NON-ADVERTISING ILLUMINATED NON-FLASHING ACCESSORY BUSINESS WALL SIGN WORDING : LINCOLN MARKET
INSTALLATION OF A NON-ADVERTISING I LLUMINATED NON-FLASHING ACCESSORY BUSINESS WALL SIGN WORDING : LINCOLN MARKET
REPLACE AND RELOCATE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Propose in Cellar 5 Floor Drains, 4 Non Res sinks, 1 Grease trap. On first floor 5 Cooking Equipment, 21 F.D., 7 Non-res sinks and 2 Grease traps.
Supermarket fit out in existing Commercial space.
Combination of apartments 5A and 5B. New opening between apartments 5A and 5B. Minor plumbing work under separate application.
PROPOSED GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
remove and replace with new (1) toilet, (1) lavatory, (1) kitchen sink. convert bathtub to built in shower.
interior renovation of existing apartment. Work to include partition for new room and refinishing of existing kitchen and bathroom. No change to use or egress
Interior demolition of non load bearing partitions.
RENOVATION OF APARTMENT 7R TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES. REPLACE AND RELOCATE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for Leak repairs as per plans filed herewith.
tenant fit out for Matto Expresso quick service restaurant- new architectural finishes, new kitchen equipment.
MINOR PARTITION WORK, FINISHES AND PLUMBING WITHIN APT 6-j. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INTERIOR RENOVATION OF EXISTING RETAIL SPACE. REMOVAL OF NON-BEARING INTERIOR PARTITIONS AND ASSOCIATED GWB CEILING. INSTALLATION OF PLUMBING FIXTURES TO BE FILED UNDER SEPARATE APPLCATION. NO CHANGE IN USE, OCCUPANCY OR EGREES
Job filed to show remodeling of the kitchen and to supersede job# 100483022. No change in use, egress and occupancy.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACEMENT OF BATHROOM AND KITCHEN FIXTURES WITHIN APT 6-J
NEW FIXTURES, FINISHES AND PARTITION WALLS PER PLANS.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing work associated with the combination of apts 9V & 9W as per TPPN 3/97. Work includes the removal of fixtures from one kitchen, install new bathroom, and renovate existing bathroom as per plans uploaded. No change in use, egress, or occupancy.
FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FILED IN CONJUNCTION WITH ALT 2 #123845376. RENOVATION OF BATHROOMS AND KITCHEN
modify exist. plumbing work. CAP PLUMBING/GAS IN KITCHEN 7M. RENOVATE BATHROOM IN 7M, RENOVATE KITCHEN 7N. No change in use, egress or occupancy
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018