1009 1 AVENUE, Manhattan, NY, 10022 · New York City · 55 total events
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Call
Call
Remove and Install interior non load bearing partitions and doors per plans filed.
DEMOLISH (2) EXISTING HVAC UNITS LOCATED ON FOURTH FLOOR ROOF TO RESOLVE FDNY SUMMONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Judgment: NO
ADDING (3) NEW WATERSOURCE VERTICAL HEATPUMPS TO SERVE THEEXHALE SPA SPACE WITH ITS ASSOCIATED SUPPLY & RETURN DUCTWORK, PIPING, & CONTROLS, UTILIZING BASE BUILDING AC UNIT WITH ASSOCIATED DUCTWORK TO SERVE THE NEW GYM,ADDING LAUNDRY FAN ON ROOF.
Modifications to existing Sprinkler/Standpipe system related to Exhale Spa build-out.
Mobile App
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___70___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VHFHSZ).For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B.
REINFORCED CONCRETE STRUCTURE GARAGE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Construction interior partitions and hung ceilings related to Exhale Spa build out.
Mobile App
Modifications to existing Sprinkler/Standpipe system related to Exhale Spa build-out.
FILING FOR PLUMBING DEMOLITION OF BATHROOMS AND LAUNDRY ON 23RD FLOOR.
Installation of Plumbing fixtures and piping related to Exhale Spa build-out.
Structural reinforcements for renovation related to Base Building Landlord Work including the installation of new floor framing at Sub-Cellar 1 supported by new steel posts at Sub-Cellar 2
Modifications to existing HVAC system, removal and installation of ductwork, piping and mechanical equipment related to Base Building Landlord Work, White Box fit out.
Remove and Install interior non-load rated partitions, partial 1st fl. Demo of retail entry related to Base Building Landlord Work, white box fit out
Removal and installation of Plumbing fixtures, piping, New Water supply with sub-meter related to Base Building Landlord Work white box fit out.
Modification to existing Sprinkler/Standpipe system in conjunction of renovation for Base Building Landlord Work fit-out.
Modification to existing Sprinkler/Standpipe system in conjunction of renovation for Base Building Landlord Work fit-out.
This Application is Filed For a Temporary Use Permit for Model Room Penthouse A pursuant to section AC28-11 and Buildings Bulletin 2010-002. There is no construction work filed.
skylight protection installed per plans, no change in use, egress or occupancy
Plumbing Alterations for the 56th Street plaza for the Parker Hotel
Installing ventilation ducts and piping
Removal and Construction of concrete sidewalk, sidewalk grates, planters related to renovation at 56th Street plaza for the Parker Hotel.
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Sidewalk Shed installed per plans, no change in use egress or occupancy
MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR CONDO WORK.
Installation of new concrete topping slab, steps and ramps on styrofoam. Work at Cellar, 1st, 3rd and 4th floors including new steel frame for support of a new hood above 1st floor, new slab openings at 3rd and 4th floor, new grease trap@ Cellar.
INSTALLATION OF HORIZONTAL NETTING AS PER PLANS. HORIZONTAL NETTING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING.
REMOVE AND INSTALL MECHANICAL HVAC DUCTWORK AND EQUIPMENT PER PLANS.
REMOVE AND INSTALL INTERIOR NON-LOAD BEARING PARTITIONS AND HUNG CEILING RELATED TO 23RD FLOOR RENOVATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
Installation of mechanical, HVAC units and related ductwork for Condo Interior work.
MODIFICATION TO EXISTING HVAC, UNITS, DUCTWORK AND ALL ASSOCIATED PIPING.
Installation of plumbing fixtures for new bathroom in Lobby Public Space. Replace fixtures @ Mezzanine level. Install new sanitary piping @ cellar
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
pipe scaffolding installed per plans, no change in use, egress or occupancy
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DUE TO EMERGENCY CONDITION (CRANE) AT 111 WEST 57 STREET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALL TEMPORARY GRAVITY WATER TANK TO CONNECT TO EXISTING BUILDING STANDPIPE SYSTEM DURING EXISTING GRAVITY TANK REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
MODIFICATION TO EXISTING COMBINED SPRINKLER (INCLUDING 5,206 NEW, 112 REMOVED, WORK ON 5,318 HEADS TOTAL. NO REPLACEMENTS, OR RELOCATES) AND STANDPIPE SYSTEM RELATED TO ALTERATION OF BUILDING. FLOORING SUB-CEL #1, SUB-CEL #2, CEL, 1 THRU 40, PEN, ROF
INSTALLATION OF FENCE FOR PEDESTRIAN AND WORKER SAFETY DURING CONSTRUCTION. FENCE SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED PIPING.
Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, 4th floor and Roof.