1003 1 AVENUE, Manhattan, NY, 10022 · New York City · 152 total events
Structural modification on the Cellar,1st floor (Cuerno Restaurant as per plans. No change to muse, egress or occupancy.
Modifications to the existing HVAC System: Install (2) new AC Units, ductwork, diffusers, and FCU and associated piping on the 45th Floor (CO)/ 46th Floor (Mktg) as per plans (Bessemer Trust.) No change to use, egress or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy.
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Filing herewith interior renovation in existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
Filing herewith mechanical work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
Filing herewith sprinkler work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
Install (1) lavatory, (1) WC, (1) refrigerator, (2) floor drains and (1) pantry sink and associated piping on the Cellar (CO)/ Concourse (Mktg); Install new sanitary piping on the Sub-Cellar #2 (CO)/ C3 (Mktg) as per plans (Concourse Level New Game Room.)
Sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to the existing Sprinkler System: Install (22) new sprinkler heads and associated piping on the Cellar (CO)/ Concourse (M) as per plans (Concourse Level New Game Room.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Install new ductwork, diffusers, and FCU and associated piping on the Cellar (CO)/ Concourse (Mktg) as per plans (Concourse Level Game Room.) No change to use, egress or occupancy.
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar (CO)/ Concourse (Mktg) as per plans (Concourse Level New Game Room.) No change to use, egress or occupancy.
Filing herewith sprinkler work on existing 5th floor. No change in use, egress or occupancy.
FILING HEREWITH MECHANICL WORK, EXISTING AIR HANDLING UNIT AHU-5-1, TO BE ROTATED TO ALLOW ROOM FOR NEW AHU-5-3 ON EXISTING 5TH FLOOR SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of new guardrail at the inside perimeter or the main roof, inboard of the parapet. Removal of aluminum/steel decorative spires as the north face of the Auditorium on the 8th Floor setback roof. No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Install (69) new heads on the Cellar (CO)/ Con (M); Remove (29) heads and Install (64) new heads and associated piping on the 1st Flr as per plans (Cuerno Restaurant.) No change to use, egress or occupancy.
Installation of new Gas Fired Commercial Kitchen Cooking Equipment, Plumbing Fixtures and associated Gas/ CW/ Sanitary Piping on the Cellar Level (CO)/ Concourse (Mktg) and 1st Floor as per plans (Cuerno Restaurant.) No change to use, egress or occupancy.
Interior Alterations/modification to existing conference room to Execute IT Support Room including new demising walls, ceilings, and furniture on the 41st floor No change in use, egress, or occupancy
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar (CO)/ C1 (Mktg) & 1st Floor as per plans (Cuerno Restaurant.)
Modifications to the existing HVAC System: Install new Mechanical Systems for new restaurant, hood and ductwork on the Sub-cellar #1 (CO)/ Cellar (Mktg), Cellar (CO)/ Concourse (Mktg) and 1st Floor as per plans (Cuerno Restaurant.)
Modifications to the existing sprinkler system (Control Board Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy
Modifications to the existing HVAC system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
Storefront louver replacement on the 1st floor (Louver & Airduct Replacement) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system (Louver & Airduct Replacement) as per plans. No change to use, egress or occupancy.
Structural modifications for new stair opening on the 1st floor as per plans. No change to use, egress or occupancy.
SPRINKLER MODIFICATIONS ON 40TH FLOOR (41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
MECHANICAL DUCT WORK ON 40TH FLOOR ( 41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
MECHANICAL WORK AT 7TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Modifications to the existing HVAC system on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
Removal of existing plumbing fixtures and associated piping on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system (MTA Entrance Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system (MTA Entrance Upgrade) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, walls and suspended ceilings (Control Board Upgrade) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, revolvers, doors, walls and suspended ceilings (MTA Entrance Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system (Control Board Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system (MTA Entrance Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system (Control Board Upgrade) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 22nd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
SPRINKLER WORK ON ASSOCIATED PIPING, AS SHOWN ON PLANS FILED HEREWITH
MECHANICAL WORK AS SHOWN ON PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
SPRINKLER MODIFCATIONS ON AN EXISTING SYSTEM AS SHOWN ON PLANS FILED HEREWITH.
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY