IRA to assist with Condition Assessment
Roof replacement as per plans. No change in use, egress, or occupancy.
Facade Inspection, IRA techniques and methods, see attached plan, see attached means and methods.
Renewal of SR23/0040
PIPE SCAFFOLD TO BE INSTALLED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of a Sprinkler head on the 17th FL.
Removal of partitions,, doors and modification to the existing plumbing core bathrooms in the existing 17th FL office Space. No Change to occupancy, egress or use.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AND NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Shoring the 18th floor, roof slab, & 17th floor in select locations.
RELOCATE TWO (2) 50-HP CONDENSER WATER PUMPS AND RECONFIGURE THE ASSOCIATED CONDENSER WATER PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Structural Repairs at the 17th floor and roof. No change in use, egress, or occupancy.
water tank piping. EXISTING GALLON TANK on the 18th floor TO BE UTILIZED FOR FIRE PROTECTION SUPPLY. NEW CHECK VALVE AND TAMPER SWITCH TO REMAIN
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SHORING SYSTEM AS PER PLANS. SHORING SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSE TO INSTALL SPLIT SYSTEM AC UNITS AT CELLAR AND 2ND FLOOR ROOF AS PER PLANS SUBMITTED HEREWITH.
Bulk head Demolition
Installation and replacement of plumbing fixtures on the 2nd FL, CRA Office Space.
MODIFICATION OF EXISTING DUCT WORK AND PIPING. INSTALL 3 NEW AC UNITS FOR THE 2ND FL OFFICE SPACE (CRA). AS PER PLANS FILE WITHHERE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Modification to the Sprinkler system on the 2nd FL Office Space for CRA, As per plans filed herewith. No change to use, egress or occupancy.
replace existing cooling tower for retail space who occupied cellar, first , mezzanine
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY (90'-150') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. REPLACE ANTENNAS WITH RELATED RRH UNITS AND INSTALL RRH UNITS ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.