Structural Modifications: Infill with new lintels and install new lintels for louver openings on the 16th Floor as per plans (AHU Replacement. - Exterior Louver.) No change to use, egress or occupancy.
Temporary Enclosure System for Louver Work
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to the existing Sprinkler System: Install (442) new sprinkler heads and associated sprinkler piping on the 3rd Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 3rd Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Install new: (20) WCs, (21) Lavatories, (6) urinals, (5) FDs, (7) Fridge w/IM, (4) sinks, (1) IM, (3) Bevi, (4) HWH, (2) WD/IM and associated CW/sanitary piping on the 3rd Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 3rd Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
INSTALL REPLACEMENT FUEL STORAGE TANK AS PER PLANS. REMOVE EXISTING FUEL STORAGE TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install (24) Lavatories, (23) WCs, (6) urinals, (1) DF, (10) FDs, (6) WD/IM, (6) HWHs, (4) sinks and associated CW/sanitary piping on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Install (13) WCs, (9) Lavatories, (4) urinals, (2) DWs, (6) sinks, (1) CM, (2) IM, (8) Floor drains, (4) HWH and associated CW/sanitary piping on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Structural framing and modifications on floors 19-21 as per plans filed herewith. No changes to use, egress or occupancy.
General construction on 20th floor (and associated stair work between 19 and 20) as per plans filed herewith. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on 20th floor as per plans filed herewith. No changes in use, egress or occupancy.
Mechanical modifications on 20th floor as per plans filed herewith. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 20th floor (and connection to existing piping on 19th fl) as per plans filed herewith. No changes in use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Install (324) new sprinkler heads and associated sprinkler piping on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Install (2) HWH, (1) Ice maker, (2) Coffeemakers, (1) Water dispensers, (1) sink, (4) Drinking fountains, (1) FDs, (13) WCs, (13) Lavatories, (4) Urinals and associated CW/sanitary piping on the 23rd & 24th Floors each (Mayer Brown.)
Structural Modifications: Beam Penetrations from MEP systems on the 21st Floor as per plans (Rock Group - HQ Relocation.) No change to use, egress or occupancy.
Remove (1) FHS & cabinet and Install (1) new FHS each on the 23 & 24th Floors. Install (406) new heads on the 23rd Floor and Install (409) heads on the 24th Floor and associated piping as per plans (Mayer Brown.) No change to use, egress or occupancy.
Remove (1) FHS & cabinet and Install (1) new FHS each on the 23 & 24th Floors. Install (406) new heads on the 23rd Floor and Install (409) heads on the 24th Floor and associated piping as per plans (Mayer Brown.) No change to use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, diffusers and FCU, supplemental units and associated equipment and piping on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Minor interior demo. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 15th Floor as per plans (Rock Group - Office Demo.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's, CRACs and associated equipment and piping on the 23-24th Floor as per plans (Mayer Brown.) No change to use, egress or occupancy.
Install (552) new sprinkler heads and associated sprinkler piping on the 4th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Structural Modifications: Install new stair platform and HSS stair stringers between 23 & 24th Floors as per plans (Mayer Brown.) No change to use, egress or occupancy.
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 23-24th Floors as per plans (Mayer Brown.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 4th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 4th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Install (25) Lavatories, (24) WCs, (6) urinals, (12) FDs, (7) IM, (8) HWHs, (5) sinks and associated CW/sanitary piping on the 4th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Install new precipitator on the 16th Floor, Mechanical work includes ductwork removal, refurbishment, new exhaust fans, and a pollution control unit on the Cellar, 1st & Mez as per plans (Del Friscos.)
Minor interior demo. Installation of new interior partitions, flooring, walls, suspended ceilings, millwork, lighting and finishes on the Cellar, 1st & Mezzanine levels as per plans (Del Frisco's NYC Double Eagle.) No change to use, egress or occupancy.
Structural Modifications: Addition of undercounter steel to support mezzanine back bar shelving. Threaded rod to be installed at mezzanine ceiling to support custom light fixture over bar (Del Frisco's NYC Double Eagle.)
Demolition of existing plumbing fixtures and piping back to riser on the 20th & 21st Floors as per plans (Rock Group - Office Demo.) No change to use, egress or occupancy.
Remove (313) sprinklers head and piping each on the 20-21st Floors, Remove (1) FHC and piping on the 21st Floor. Install (43) temp heads and loop each on the 20th & 21st Floors as per plans (Rock Group - Office Demo.)
Remove (313) sprinklers head and piping each on the 20-21st Floors, Remove (1) FHC and piping on the 21st Floor. Install (43) temp heads and loop each on the 20th & 21st Floors as per plans (Rock Group - Office Demo.)
Modifications to the existing HVAC System: Demolition of existing ductwork back to riser on the 20-21st Floors as per plans (Rock Group - Office Demo.) No change to use, egress or occupancy.
Remove (14) Lavatories, (12) WCs, (4) UR and piping. Install (1) HWH, (1) Floor drain, (13) Lavatories, (13) WCs, (4) Urinals and associated CW/sanitary piping on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Relocate (15) sprinkler heads and Install (13) new sprinkler heads and associated piping on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Minor interior demo. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 20-22nd Floors as per plans (Rock Group - Office Demo & Stair Infill.) No change to use, egress or occupancy.
Structural Modifications: floor infills on the 21st & 22nd floors as per plans (Rock Group - Office Demo.) No change to use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 9th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Install new Fixtures: (9) WCs, (5) Lav, (2) UR in the Cellar, (4) WC, (4) Lav, (1) UR on the Mezzanine, (2) WC, (2) Lav, (2) FD's on the 1st Floor and CW/sanitary piping on Cel, Mez, 1st and 16th Floors as per plans. as per plans (Del Friscos NYC.)
Modifications to the existing HVAC System: Removal and replacement of HVAC equipment and system, including (11) Air Handling Units being replaced on the 16th Floor as per plans (AHU Replacement.) No change to use, egress or occupancy.
Minor interior demolition: create openings for new louvers and installation of new louvers on the 16th Floor per plans (AHU Replacement.) No change to use, egress or occupancy.
Structural Modifications: Replacement of existing concrete pads with new and installation of structural steel to support ceiling mounted equipment on the 16th Floor as per plans (AHU Replacement - Interior.) No change to use, egress or occupancy.
Minor demo of interior finishes. Build new wall to split existing retail space into two and white box space, replacement of existing retail entrance with new on the 1st floor as per plans (South Retail Entrances.)