Architectural modifications in support of upgrades to the building facade and interior finish. No change in use, egress or occupancy.
MODIFICATOINS TO EXISTING PLUMBING/SPRINKLER FIXTURES AS PER PLANS FILED HEREWITH.
Self Service
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Installation of a temporary sprinkler loop as per the filed drawings. No change to use, occupancy or egress.
Modifications to existing mechanical systems as per plans filed herewith. No change to use, egress, or occupancy.
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to existing mechanical systems as per plans filed herewith. No change to use, egress, or occupancy.
Demo, relocations, and additions of sprinkler and plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Structural modifications as per plans filed herewith. No change to use, egress, or, occupancy.
Demo, relocations, and additions of sprinkler and plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - PROPER FOOD. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - PROPER FOOD. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Suspended Scaffold for Facade Restoration as Shown on Plans
ADDITIONS/MODIFICATIONS TO EXISTING PLUMBING/SPRINKLER FIXTURES AS PER PLANS FILED HEREWITH.
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Sprinkler head removals and new installation as per plans filed herewith. No change to use, egress, or occupancy.
Modification of the existing sprinkler system as per the filed drawings. No change to use, occupancy or egress.
Modifications to existing mechanical systems as per plans filed herewith. No change to use, egress, or occupancy.
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Herewith filing Plumbing work in conjunction with interior renovations of 41st Floor Offices. No Change in Use, Egress or Occupancy is Proposed under this application.
Installation of temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction on floors 25, 26, 30 as per plans filed herewith. No changes in egress, use or occupancy.
Mechanical modifications on floors 25, 26, 30 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing modifications on floors 25, 26, 30 as per plans filed herewith. No changes in use, egress or occupancy.
Sprinkler modifications on floors 25, 26, 30 as per plans filed herewith. No changes in use, egress or occupancy.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary construction fence/enclosure for weather protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Concrete curbs and raised slabs on insulation or metal deck at the plaza and storefront area. Concrete on insulation at 6th ave and 47th street vestibules. Structural steel for vestibule framing, trellis framing, slab openings, and steel reinforcement.
Filing herewith drawings indicating modification of the mechanical system on the 5th floor. No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating interior renovations on the 5th floor. No change in use, egress, or occupancy under this application.
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
ADDITIONS/MODIFICATIONS TO EXISTING PLUMBING/SPRINKLER FIXTURES AS PER PLANS FILED HEREWITH.
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HERWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of new sprinkler heads and 1 relocated fire hose cabinet. No change in use, egress, or occupancy. .
Installation of new sprinkler heads and 1 relocated fire hose cabinet. No change in use, egress, or occupancy. .
ADDITONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUAPANCY
Proposed temporary overhead protection/ work platform and material hoist as per plan submitted. No change in use, egress and/or occupancy with this filing.
Herewith filing modifications to existing sprinkler system in conjunction with interior renovations at 41st Floor Office space. No Change in use, egress or occupancy is proposed under this application.
Herewith filing modifications to existing mechanical system at 41st floor in conjunction with interior renovations. No change in use, egress or occupancy is proposed under this application.
Herewith Filing Interior Demolition and Renovations of 41st Floor Offices as per plans. No change in use, egress and occupancy is proposed under this application.
Converting a small auditorium space into storage facilities and an office.
Installation of new plumbing and sprinkler and standpipe fixtures and pre-action valves as per plans filed herewith.
Installation of new plumbing and sprinkler and standpipe fixtures and pre-action valves as per plans filed herewith.
Installation of new plumbing and sprinkler and standpipe fixtures and pre-action valves as per plans filed herewith.
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy.
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.