10 WEST 46 STREET, Manhattan, NY, 10036 · New York City · 24 total events
INTERIOR RENOVATION OF EXISTING COMMERCIAL BUILDING LOBBY; MINOR PARTITION WORK, NEW WALL FINISHES & NEW LIGHTING FIXTURES THROUGHOUT PROPOSED UNDER THIS APPLICATION. THERE IS NO PROPOSED CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
NEW PLUMBING WORK ASSOCIATED WITH 11TH FLOOR OFFICE BATHROOMS AND PANTRY. PROVIDE NEW SPRINKLER HEADS TO EXISTING BUILDING SPRINKLER SYSTEM FOR OFFICE RENOVATION WITH JOB#M00895109. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
NEW BEAMS FOR VAULT SUPPORT IN OFFICE SPACE IN CONJUNCTION WITH ALT2 FILING M00541713-I1
MODIFICATIONS TO AND INSTALLATION OF NEW MECHANICAL DUCTWORK, VAV BOXES, AIR TERMINALS FOR HEATING AND COOLING OFF EXISTING AIR CONDITIONING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THESE PLANS AND APPLICATION
MODIFICATION OF EXISTING SPRINKLER SYSTEM TO MATCH THE NEW LAYOUT OF THE 17TH FLOOR.
NEW PLUMBING WORK ASSOCIATED WITH 11TH FLOOR OFFICE BATHROOMS AND PANTRY. PROVIDE NEW SPRINKLER HEADS TO EXISTING BUILDING SPRINKLER SYSTEM FOR OFFICE RENOVATION WITH JOB#M00895109. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
THE PLUMBING WORK TYPE IS FILE IN CONJUCTION WITH #
PROVIDE NON-LOAD BEARING PARTITIONS, DOORS, CEILINGS, LIGHTS FOR 11TH FLOOR OFFICE SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION ON 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW DUCT SYSTEM AND CONNECT TO EXISTING VERTICAL A/C AIR COOLED UNIT. PROVIDE NEW AIR DISTRIBUTION DEVICES AND NEW THERMOSTAT.
NEW SPRINKLER HEADS TO BE CONNECTED TO EXISTING SPRINKLER RISER AND PROVIDING NEW PLUMBING FIXTURES AND PIPING FOR A RENOVATED OFFICE SPACE, IN CONJUCTION TO M00541713-I1(GC/MH)
NEW SPRINKLER HEADS TO BE CONNECTED TO EXISTING SPRINKLER RISER AND PROVIDING NEW PLUMBING FIXTURES AND PIPING FOR A RENOVATED OFFICE SPACE, IN CONJUCTION TO M00541713-I1(GC/MH)
INTERIOR RENOVATION OF EXISTING OFFICE SPACE AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Application filed to propose the direct replacement of the existing Heatwave (Model # AVTS180) Vertical Packaged Self Contained Air Cooled Unit (Condenser, Evaporator and Economizer) at 005. No change to the ductwork. No change in bulk, use or egress.
NEW PARTITIONS, NEW HUNG CEILING, & DOORS, NEW LIGHTS, AND NEW AC DUCTS/DIFFUSER FOR EXISTING AC UNIT AT 15TH FLOOR. IN CONJUNCTION TO PL &SP FILING UNDER M00541725-I1. FA AND STRUCTURE FILED SEPERATELY . NO CHANGE TO USE EGRESS OR OCCUPANCY.
Renovate office space on the 6th floor. No change to use, egress or occupancy.
SPRINKLER WORK IN CONJUNCTION WITH INTERIOR RENOVATION ON 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION ON 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ADJUSTING EXISTING SPRINKLER HEADS LOCATION AS PER NEW LAYOUT. PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
ADJUSTING EXISTING SPRINKLER HEADS LOCATION AS PER NEW LAYOUT. PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
RELOCATION OF NON-BEARING PARTITIONS AS PER NEW LAYOUT FOR 14 FLOOR, ADJUSTING EXISTING A/C DISTRIBUTION, NEW INTERIOR FINISHES AND SUSPENDED CEILING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Reuse existing main air cooled packaged unit to provide cooling and heating to the space. Provide VAV zone control to help control varying cooling loads throughout the space.
Modifications to existing Sprinkler system. Relocation/addition of branch piping and sprinkler heads. Modifications to existing Plumbing fixtures.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019