10 UNION SQUARE EAST, Manhattan, NY, 10003 · New York City · 144 total events
Interior renovation of existing apt G23B. Install new flooring, replace closet doors, finish bathroom and kitchen. No change in use, egress and occupancy.
Plumbing work in conjunction to interior renovation of G23B. No change in use, egress and occupancy
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OFTEMPORARY SHORING AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FOR MERGER OF DWELLING UNITS V23C & D
Minor interior renovation to install one partition. No change in use, egress, or occupancy.
Minor interior renovation to install one partition. No change in use, egress, or occupancy.
Filing to modify plumbing fixtures at 9th floor apartment P9F as per plans. No change in use, egress, or occupancy under this application.
Minor interior renovation to install one partition. No change in use, egress, or occupancy.
Filing interior renovation at 9th floor apartment #P9F as per plans. No change in use, egress, or occupancy under this application. Plumbing and mechanical to be filed as subsequent filings.
Mount Sinai - Phase 2 - Plumbing modifications as per plans filed herewith.
Modification of 1st floor plumbing per plans filed herewith
Mount Sinai - Convert exist. Conference Room (PA # 101148517) to offices.
replace and relocate plumbing fixtures in guest and main bathroom as shown in plan. Shower replaces existing main bath tub. 1 new lav in main bath. 1 new clothes washer in closet.
GARAGE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior renovation of existing apartment on 24th floor of existing 27 floor building as per plans. No change to use, egress or occupancy.
Project scope includes new PTAC units & new bathroom exhaust ductwork.
Mount Sinai - Upgrade - Phase 2 - Interior renovations including modifications to non load partitions, ceiling, flooring millwork ,and related construction as per plans file herewith. no change in use, egress or occupancy.
Mount Sinai - - HVAC Replacement - Removal and Replacement of existing Sprinkler heads and related piping as per plans filed herewith.
MERGER OF DWELLING UNITS V23C & D PER TPPN 3/97
Mount Sinai - HVAC Replacement Phase 2 - Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy.
HEREBY FILING FOR THE RELOCATION AND INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Filing general construction work in the existing health club area on the 6th & 7th floor as per plan filed herewith. No change in use, egress, and occupancy.
Mount Sinai - Phase 2 - Sprinkler modifications as per plans filed herewith.
Project scope includes demolishing existing plumbing fixtures and replacing them with new.
Modifications to Sprinkler Systems as per plans herewith, no change to in use, egress or occupancy.
MECHANICAL FILING FOR NEW DUCT DISTRIBUTION SYSTEM AND ASSOCIATED WORK AS PER PLANS HEREWITHNO CHANGE IN USE, OCCUPANCY OR EGRESS.
GENERAL CONSTRUCTION FOR INTERIOR FITOUT FOR A CLINICAL SUITE ON THE 2ND FLOOR AND RELATED LAB SUPPORTING AREAS, NEW FINISHES, MATERIALS AND CEILING, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PLUMBING WORK AS PER PLANS HEREWITH.
Herewith filing General Construction modifications for Mount Sinai Radiation and Oncology Renovation. No change in use, egress, or occupancy.
Mount Sinai - ADA Upgrades - Interior renovations including modifications to non load bearing partitions, millwork, ceilings, doors, flooring and related construction as per plans filed herewith. No change in use, egress, or occupancy
Apt unknown — Possession
MOUNT SINAI - Physician's Touchdown Conference Rooms- Modifications to Sprinkler/Standpipe system including the relocation of a fire hose cabinet as per plans filed herewith. No change in use, egress, or occupancy.
MOUNT SINAI - Physician's Touchdown Conference Rooms- Modifications to Sprinkler/Standpipe system including the relocation of a fire hose cabinet as per plans filed herewith. No change in use, egress, or occupancy.
MOUNT SINAI - CONFERENCE ROOM - MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mount Sinai -Physician's Touchdown - Mechanical Modifications related to the conversion of existing conference Room into offices.as per plans filed herewith. No change in use, egress, or occupancy
Herewith filing Mechanical modifications for Mount Sinai Radiation Oncology Renovation. No change to use, egress, or occupancy.
herewith file plans to replace, relocate and install plumbing fixtures in Apt. V19FG. GC filed under M00826373
Apt. V19FG- renovate and expand kitchen, renovate 2 bathrooms, relocate door of guest bath, minor modification to non structural partitions, update finishes throughout. Plumbing to be filed under separate application
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Mount Sinai - Conference Room - Mechanical related removals as per plans filed herewith. No change in use, egress, or occupancy.
BASEBUILDING CORRIDOR AC UNIT REPLACEMENT ON 7TH FLOOR
Mount Sinai - Conference Room - Interior demolition to non load bearing partitions, flooring, ceilings, and related construction sa per plans filed herewith. No change in use, egress, or occupancy.
Mount Sinai - Upgrade - Phase 2 - Mechanical Modifications as per plans filed herewith.
Minor interior renovation to include but not limited to removal of non load bearing partitions.
Herewith filing Structural modifications for Mount Sinai Radiation Oncology Renovation. No change to use, egress, or occupancy.
Modification of Mechanical systems per plans filed herewith
Herewith filing Plumbing modifications for Mount Sinai Radiation Oncology Renovation. No change to use, egress, or occupancy.
Herewith filing Sprinkler Modifications for Mount Sinai Radiation Oncology Renovation. No change in use, egress, or occupancy.
Structural modification on 1st floor and mezzanine per plans filed herewith