1 PARK AVENUE, MANHATTAN, NY 10016 · New York City · 65 total events
CHANGE GRADE FROM #2 FUEL OIL TO TRUBURN RENEWABLE FUEL OIL.
Storage Tenant Space - Sprinkler work on the cellar level as indicated on drawings.
Sprinkler work on the 18th floor (19th floor CO) as indicated on drawings.
Plumbing work on the 18th floor (19th floor CO) as indicated on drawings.
Storage Tenant Space - Construction work on the cellar level as indicated on drawings.
Construction work on the 18th floor ( 19th floor CO), 19th floor (20th floor CO) and roof (21st floor) as indicated on drawings.
Structural work on the 19th floor (20th floor CO) and roof (21st floor) as indicated on drawings.
Mechanical Work on the 18th floor (19th floor CO) a indicated on drawings.
Herewith filing Structural modifications for NYU Langone Condenser Water Riser Replacement project. No change in use, egress, or occupancy.
Herewith filing Mechanical modifications for NYU Langone Condenser Water Riser Replacement project. No change in use, egress, or occupancy.
Lounge Project - Construction work on the 1st floor as indicated on drawings.
ADA Lift - Construction work on the 1st floor as indicated on drawings.
ADA Lift - Structural work on the 1st floor as indicated on drawings.
Whitebox - Sprinkler work on the 18th (19th Marketing), 19th floor (Marketing) and roof as indicated on drawings.
(NYULH) Sprinkler work on 11th floor as indicated on drawings.
(NYULH) Architectural work on 11th floor as indicated on drawings.
(NYULH) Mechanical work on 11th floor as indicated on drawings.
Whitebox - Structural work on the roof as indicated on drawings.
Whitebox - Construction work on the 18th (19th Marketing), 19th floor (20th Marketing) and roof as indicated on drawings.
NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SIGN WORDING: NYU langone Health
NON ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SIGN WORDING: NYU langone Health
Removal of plumbing fixtures and capping pipes on the 19th & 20th floors as indicated on drawings.
(NYULH) Standpipe work on 11th floor as indicated on drawings.
Plumbing work to create bathroom for workers on the 19th floor (20th floor tenant space) as indicated on drawings.
Minor construction work to the 19th floor (20th floor tenant space) as indicated on drawings.
Minor mechanical work on the 19th floor (20th floor tenant space) as indicated on drawings.
INSTALLATION OF A SPRINKLER SYSTEM ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
Demolition of sprinkler system and installation of temporary sprinkler loop on 11th floor.
(NYULH) Plumbing work on 11th floor as indicated on drawings.
Architectural work on 14th floor (NYULH) as indicated on drawings.
Standpipe work on 14th floor (NYULH) as indicated on drawings.
Sprinkler work on 14th floor (NYULH) as indicated on drawings.
Plumbing work on 14th floor (NYULH) as indicated on drawings.
Mechanical work on 14th floor (NYULH) as indicated on drawings.
Replacement of 2.5 ton split air conditioning system for the IT Room. No change in use egress and occupancy.
Interior demolition of nonloadbearing partitions and related work on 11th floor.
Demolition and removal of mechanical ventilation system on 11th floor.
Demolition of plumbing fixtures and capping piping on 11th floor.
Remove sprinkler heads and piping, install temporary sprinkler protection at core on 14th floor.
Interior demolition of nonloadbearing partitions, hung ceilings and related work on 14th floor.
Remove plumbing fixtures and cap piping on 14th floor.
Interior demolition of nonloadbearing partitions and related work on part of 1st floor.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
Removal of sprinkler heads on the 19th & 20th floors as indicated on drawings.
INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHPATER 33 OF 2014 B.C
8368 - Interior Renovation - a.Replacement of interior door, restroom remodel, ramp resurfacing.
Interior demolition of non-load bearing partitions on the 19th & 20th floors as indicated on drawings.
Mechanical demo on the 19th & 20th floors as indicated on drawings.
Plumbing work on 9th & 12th floors as indicated on drawings.
INSTALLATION OF TEMPORARY 182' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.