1 MORTON SQUARE, Manhattan, NY, 10014 · New York City · 24 total events
THE WORK INCLUDES THE INTERIOR REMODELING OF A SINGLE UNIT IN AN EXISTING 4-STORY, 8-UNIT (2 OFFICE/ 6 RESIDENTIAL) MIXED-USE, MASONRY BUILDING.OCCUPANCY GROUP B/R2TYPE IIIA CONSTRUCTION
Installation of suspended scaffold for facade work or inspection.
PLUMBING MODIFICATIONS (FOLEY RESIDENCE RENOVATION PH-AE) NO CHANGE OF USE EGRESS OR OCCUPANY.
0 infested unit(s) reported
MINOR INTERIOR NON LOAD BEARING PARTITION MODIFICATIONS AND FINISH UPGRADES AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Apartment Renovations (Foley Residence Renovations PH-AE) General Construction work to include partitions, doors and ceiling modifications and related finishes as per plans. No change in use egress or occupancy.
MECHANICAL MODIFICATIONS AT SUBJECT PREMISES (FOLEY RESIDENCE, PENTHOUSE RENOVATION) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Suspended scaffold outrigger installation for Facade restoration works.
Mobile App
SPRINKLER MODIFICATIONS (Foley Residence Renovations PH-AE 14th floor) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Remove four existing water sourced heat pumps and replace with two new vertical water sourced heat pumps.
This GC application is being filed for an interior renovation to apartment 12DW. Work to include non structural partitions, ceiling, millwork, fixtures. No change to egress, occupancy.
Minor demolition to non-load bearing walls. Construct new bedroom and relocate kitchenette. Modify entry to bedroom 1 and bath 1. No change to use, occupancy or egress.
INSTALLATION OF NON BEARING PARTITIONS AND GENERAL CONSTRUCTION RELATED TO RENOVATION OF APARTMENT 4BE.
REPLACEMENT OF EXISTING A/C PACKAGE UNITS.
REPLACEMENT AND MODIFICATION OF EXISTING PLUMBING FIXTURES AND GAS LINE IN APARTMENT 4BE.
JOB FIELD TO DO MINOR GENERAL RENOVATION IN A EXISTING APARTMENT
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNIT 6DW ON 6TH FLOOR OF RESIDENTIAL BUILDING. ARCHITECTURAL WORK FILED UNDER BIS # 140971205. NO CHANGE IN USE,OCCUPANCY, OR EGRESS.
Exterior faade repairs as per the plans filed including: Concrete spall & crack repairs. Replacement of sheet metal and sealant at windows & precast concrete panels. Coating of precast concrete.
Exterior facade repairs as per the plans filed including: Concrete spall & crack repairs. Replacement of sheet metal and sealant at windows and precast concrete panels. Coating of precast concrete.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNIT 6DW ON 6TH FLOOR OF RESIDENTIAL BUILDING. ARCHITECTURAL WORK FILED UNDER BIS # 140971205. NO CHANGE IN USE,OCCUPANCY, OR EGRESS.
replace in existing location: (2) lav, (2) toilet, (1) sink
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019