1 EAST 62 STREET, Manhattan, NY, 10065 · New York City · 16 total events
Interior renovations at apt 5B. Includes minor partition work, finished ceiling work, HVAC and plumbing fixtures installation work under subsequent documents M01010156-S1/S2. Filed for plan examination of work approved under M00931002.
Installation of temporary beta max hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Filing for Terrace Waterproofing Repairs work that includes removal of existing terrace floor tiles, replacement of wood decking and waterproofing repairs to water table at 5th floor, etc. as shown on drawings filed herewith. No change in use, egress or o
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Application being filed for the interior renovation of Apt 2A, 2nd floor. Work involves replacement of the non-structural curved wall with glass, lighting upgrade, door replacements and bathroom and kitchen fixtures. No change in use, egress, or occupancy
Subsequent document for plumbing fixture work.
Installation of two air handling units in vestibule and bedroom. No change of occupancy use or egress.
Interior renovations at 5th floor apartment 5B. Work includes minor partition work, finished ceiling work, and HVAC installation and plumbing fixtures work under subsequent documents.
Removal of interior minor partition, floor, wall and ceiling finishes as well as kitchen counters and cabinets in Apt 4AB on the 4th Floor. No Change in Occupancy, use or egress.
Removal and Replacement of plumbing fixtures and appliances in kitchen and bathrooms at 4AB on the fourth floor. No change in occupancy use or egress.
Construction of new walls, floors and dropped ceilings. No change in occupancy use or egress.
INSTALLATION OF TEMPORARY 98' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.