89 SOUTH 4 STREET, BROOKLYN, NY 11249 · New York City · 7 total events
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) in conjunction with A1 application #321589063
Proposed sprinkler and plumbing in conjunction with ALT-1 job #321589063
Proposed sprinkler and plumbing in conjunction with ALT-1 job #321589063
Proposed structural work from the cellar, through 4th floor, penthouse and roof in conjunction with ALT 1 application #321589063
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
INSTALL TEMPORARY FENCE FOR THIS NEW BUILDING APPLICATION. WILL FILE SEPARATELY.NO CHANGE OF USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.