850 4 AVENUE, Brooklyn, NY, 11232 · New York City · 103 total events
Installation of one (36'x60') temporary office trailer, all as per plan. No change of use, occupancy or egress.
HEREWITH FILING THE INSTALLATION OF THE SOE FOR ELEVATOR PIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING FOUNDATION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
SUPPORT OF EXCAVATION ONLY FOR ELECTRICAL CONDUIT TO BE FILED SEPARATELY
Replace of (1) 7 1/2 Ton Condenser with electric heat coil on existing dunnage for Bldg 136 Lower Level Muster Room. No change to use, occupancy or egress.
Installation of 48KBTU Hyper Heat Condenser w/ (2) 18K BTU Ceiling Cassettes in Main Room, and (1) 12KBTU Ceiling Cassette in office for Bldg 136 Construction Loft Building. Removal of existing 4ton unit and ductwork. No change to occupancy, use or egress
INSTALLATION OF MICRO PILES, CIVIL WORK, AND STRUCTURAL WORK FOR COMPRESSOR ENCLOSURE AND PIPE RACK.
INSTALLATION OF NEW CONCRETE FOUNDATIONS FOR ELECTRICAL EQUIPMENT AND PRIVATE ASPHALT DRIVEWAY AT CON EDISON'S ASTORIA WEST SUBSTATION.
HEREWITH FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING SPRINKLER WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING SPRINKLER PRE-ACTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF SECURITY SYSTEM UPGRADE.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY CONSTRUCTION TRAILER 24'X60' FOR TDI OFFICE.
herewith filing SOE work as per plans. No change in use egress or occupancy
Installation of one temporary offices trailer as per plans. No change in use, egress, or occupancy.
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of one single story temporary employee locker trailer as per plans. No change in use, egress, or occupancy.
Installation of two (2) new 40'x8' storage containers as per plan. No change of egress, occupancy or use.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED @ BLDG. 136 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF THE ACCESS SYSTEM SCAFFOLD @ BLDG.136 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SYSTEM SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Installation of one temporary 60'X12' Office Trailer as per plans. No change of Use, Occupancy or egress.
Masonry wall repairs for facade replacement as indicated on plans, replacement in kind of exterior staircases. No change to use, egress, or occupancy.
Window replacement and exterior stairway replacement in kind. No change to use, occupancy, or egress
INSTALLATION OF ONE TEMPORARY 24'X60' LOCKER ROOM / BATHROOM TRAILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF ONE TEMPORARY 24'X60' CONSTRUCTION OFFICE TRAILER AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF ONE TEMPORARY 36'X60' CONSTRUCTION OFFICE TRAILER AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF ONE TEMPORARY 24'X60' CONSTRUCTION OFFICE TRAILER AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF ONE TEMPORARY CONTAINER TYPE C-FORT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Mechanical filing is Replacement of Trolley Hoist Motor.
Modification to existing structural systems as per plans filed herewith. No change in use, egress or occupancy.
CIVIL WORK ONLY TO OPEN SPACE - REMOVE, REPLACE, INSTALL NEW STORM DRAINAGE TO EXISTING OUTFALL B. STRUCTURAL WORK - REPLACE EXISTING RETAINING WALL. INSTALL NEW CONCRETE PAVING. DEMOLITION OF EXISTING AND INSTALLATION OF NEW FOOTINGS AT CRANE SHED AREA.
Modification to existing plumbing systems and installation of new sprinkler system as per plans filed herewith. Installation of new plumbing fixtures and new sprinkler heads. No change in use, egress or occupancy.
Modification to existing plumbing systems and installation of new sprinkler system as per plans filed herewith. Installation of new plumbing fixtures and new sprinkler heads. No change in use, egress or occupancy.
REMOVAL AND INSTALLATION OF PORTIONS OF INTERIOR BEARING WALLS & INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of new rooftop air source heat pumps and modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy
INSTALLATION OF ONE SINGLE STORY AND ONE DOUBLE STORY TEMPORARY CONED EMPLOYEE OFFICE TRAILERS AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
MECHANICAL (HVAC) SYSTEM INSTALLATION IN CONTROL ENCLOSURES 1 & 2
Replacement of Trane condenser with adapter curb connected to previous curb to line up old roof openings to the new unit. No change to use, occupancy or egress.
Installation of one (72'X60') 2- sty. temporary office trailer, all as per plan. No change of use, occupancy or egress.
Proposed installation of Control Enclosures 1 and 2 , all as per plan. No change to use, occupancy or egress.
Installation of (1) 2 Ton Condenser and (1) 2 Ton Cassette (Ceiling Hung) for Bldg 136 mailroom. No change to use, occupancy or egress.
Proposed to install piles and foundation as per plan, no change of use, occupancy or egress.
Proposed Civil work to install Duct Bank and grading, as per plan. No change of egress, occupancy or use.
REPLACEMENT OF EXISTING PLANT FLARE TIP WITH NEW TIP
Proposed Site Water retention system and associated work.
Plumbing and sprinkler work for fire truck garage as per plans filed. No change in use, egress or occupancy.
ASTORIA LNG PLANT SECURITY EQUIPMENT UPGRADE